Palm Jumeirah AED 3,554/sqftDubai Maritime City AED 3,154/sqftDowntown Dubai AED 2,890/sqftDubai Islands AED 2,771/sqftDubai Creek Harbour AED 2,563/sqftBusiness Bay AED 2,505/sqftDubai Marina AED 2,481/sqftDubai Hills Estate AED 2,455/sqftJumeirah Lakes Towers AED 2,315/sqftMohammed Bin Rashid City AED 2,099/sqftAl Jaddaf AED 2,053/sqftJumeirah Village Triangle AED 1,661/sqftDubai South AED 1,652/sqftArjan AED 1,582/sqftJumeirah Village Circle AED 1,487/sqftDubai Sports City AED 1,328/sqftALL DLD SALES · OFF-PLAN + EXISTINGPalm Jumeirah AED 3,554/sqftDubai Maritime City AED 3,154/sqftDowntown Dubai AED 2,890/sqftDubai Islands AED 2,771/sqftDubai Creek Harbour AED 2,563/sqftBusiness Bay AED 2,505/sqftDubai Marina AED 2,481/sqftDubai Hills Estate AED 2,455/sqftJumeirah Lakes Towers AED 2,315/sqftMohammed Bin Rashid City AED 2,099/sqftAl Jaddaf AED 2,053/sqftJumeirah Village Triangle AED 1,661/sqftDubai South AED 1,652/sqftArjan AED 1,582/sqftJumeirah Village Circle AED 1,487/sqftDubai Sports City AED 1,328/sqftALL DLD SALES · OFF-PLAN + EXISTING
DLD · MEDIAN 12M TO OCT 2026

Development by location

Dubai Land Department dataRegister read 13 Oct 2026Sales 28 Apr 2025 to 12 Oct 2026

Dubai development map

Where Dubai’s registered projects are concentrated, and how far along each part of the city is. Each area is a ring. The gold part of the ring is the share of its units that are ready and the grey part the share still being built, and the size of the ring shows the measure you choose: projects, units, transactions, ticket size, price per sq ft or handovers due.

  • The map covers about 3,200 projects and about 930,000 units on the Dubai Land Department project register, read 13 Oct 2026.
  • Across the city, about 60% of those units are built, counting finished projects in full and projects under construction at their last DLD-inspected percentage.
  • About 210,000 units carry a completion date in the 24 months from 13 Oct 2026.
  • Of the larger areas, Emirates Living, Meydan One and Downtown Dubai are the most built out, and City Of Arabia, Dubai Islands and Motor City are at the earliest stage.
Projects3,200rounded
Units930,000rounded
Built across Dubai60%of registered units
Due in 24 months210,000units from 13 Oct 2026
Areas7572 with their own page

The map

The Dubai development map

64 areas on the map

The Dubai development map shows 64 areas as rings. Pick a measure on the row above the map to resize them; the gold and grey of each ring always show how much of the area is ready and how much is still being built. Hover over a ring for its area and a rounded figure, or select one for a short summary with a link to that area’s projects. Press “Play the story” for five chapters from 2008 to 2030, or move the slider under the map yourself. On a phone, move the map with two fingers so the page still scrolls.

Guide

How to read the map

The ring shows the stage of development

The gold part of each ring is the share of the area’s units that are ready, and the grey part is the share still being built. Units in projects the Land Department records as finished count as ready. Units in projects still under construction count at the percentage complete that DLD’s inspector last recorded, so a project inspected at a third complete adds a third of its units to the gold. A ring that is nearly all gold is a finished area; a ring that is mostly grey is an area still being built.

The size shows the measure you pick

The area of each ring follows the selected measure, so a ring with twice the area holds about twice as many units, projects or sales. Larger rings sit underneath smaller ones, so every area stays easy to pick, and each ring stays at its own place on the map. Choosing “Stage of development” sizes the rings by units, so the gold and grey carry the message.

Zoom in close and the rings give way to small lights. Each light is a group of at least 2 projects: a solid gold centre for the share built inside a grey ring sized by the measure.

Bands and rounded figures

The map does not give exact counts. Every figure is rounded to two significant figures, which is why each one reads “about”. In the table below, stage of development has fixed bands, from mostly off-plan below 20% built to mostly ready at 80% and above, and every other measure is split into fifths of all areas, so a high band means high compared with the rest of Dubai.

The story and the time slider

“Play the story” moves the map through five chapters, from 2008 to 2030, each with a short note drawn from the register. The slider lets you pick any year. In past years a project counts once it is registered, and its units turn from being built to ready in the year of its completion date if DLD records it as finished. Years after 2026 count the completion dates on file and are drawn lighter, because a date on file is a filing with the Land Department rather than a confirmed handover.

The time view shows projects, units and stage of development. The market measures and handovers due describe the position today.

What each measure means

Measures on the Dubai development map and the period each covers
MeasureWhat it countsPeriod
ProjectsRegistered projects that are finished or under construction. Cancelled projects are left out.Register read 13 Oct 2026
UnitsUnits registered against those projects on the project register.Register read 13 Oct 2026
Stage of developmentShare of units built: finished projects in full, projects under construction at their last DLD-inspected percentage.Inspections to 9 Oct 2026
TransactionsSales of homes registered against those projects.28 Apr 2025 to 12 Oct 2026
Ticket sizeThe typical price paid: each project’s median sale price, weighted by its number of sales.28 Apr 2025 to 12 Oct 2026
Price per sq ftThe typical price per square foot, on the same basis as ticket size.28 Apr 2025 to 12 Oct 2026
Handovers dueUnits in projects under construction whose completion date on file falls in the next 12, 24 or 36 months.From 13 Oct 2026

Areas

Dubai development by area

75 areas

The table lists every area on the register with projects that are finished or under construction, under the name the area goes by on this site. Each row gives the stage of development and the bands for projects, units, handovers due and transactions, with the rounded figure beside each. Where an area has its own page in the off-plan directory, its name links to the projects registered there.

Among the areas holding 5,000 units or more, the most built out are Emirates Living (about 100% built), Meydan One (about 95% built), Downtown Dubai (about 90% built), Palm Jumeirah (about 90% built) and Dubai Sports City (about 85% built). In these areas most of the registered supply has already been delivered.

At the other end, City Of Arabia (about 10% built), Dubai Islands (about 15% built), Motor City (about 20% built), Jebel Ali (about 20% built) and Al Yelayiss 1 (about 25% built) are at the earliest stage, with most of their registered units still off-plan.

The most units due in the 24 months from 13 Oct 2026 are in Dubai Land Residence Complex (about 18,000 units), Dubai South Residential District (about 17,000 units), Jumeirah Village Circle (about 15,000 units), Business Bay (about 12,000 units) and City Of Arabia (about 12,000 units). For completion dates month by month, with the projects behind them, see the Dubai handover pipeline.

Registered sales from 28 Apr 2025 to 12 Oct 2026 were highest in Jumeirah Village Circle (about 13,000), Dubai South Residential District (about 12,000), Business Bay (about 8,400), Dubai Land Residence Complex (about 7,600) and Al Furjan (about 6,100). Finished buildings are listed in completed projects in Dubai, and longer price history is in market intelligence.

On the time view, the register shows about 6,500 units ready and about 88,000 under construction in 2008. In 2026 about 490,000 units are under construction, more than in any earlier year, and about 440,000 units in registered projects are finished. If every completion date on file is met, about 790,000 units would be ready by 2030.

How Dubai has developed since 2008

2008: the first registered projects. In 2008 the register shows about 88,000 units under construction and about 6,500 ready. The most building was in Business Bay and Jumeirah Lakes Towers.

2015: 7 years on. By 2015 about 110,000 registered units were ready and about 99,000 were under construction. The most units ready were in Jumeirah Lakes Towers and Business Bay.

2023: more units under construction. In 2023 about 170,000 units were under construction, up from about 120,000 in 2022. The most building was in Jumeirah Village Circle and Business Bay.

Today: register read 13 Oct 2026. About 440,000 units are ready and about 490,000 are under construction. The most building is in Dubai South Residential District and Jumeirah Village Circle.

2030: what is scheduled. If every completion date on file is met, about 790,000 units would be ready by 2030, with the largest additions in Dubai South Residential District and Dubai Land Residence Complex. These are completion dates on file with the Land Department, and a date on file is not a confirmed handover.

Dubai development by area: stage of development and bands for projects, units, handovers due in 24 months and transactions. Dubai Land Department, register read 13 Oct 2026; sales 28 Apr 2025 to 12 Oct 2026.
AreaStage of developmentProjectsUnitsDue in 24 monthsTransactions
Jumeirah Village CircleLargely built · 70%Very high · about 390Very high · about 74,000Very high · about 15,000Very high · about 13,000
Business BayLargely built · 75%Very high · about 160Very high · about 70,000Very high · about 12,000Very high · about 8,400
Dubai South Residential DistrictEarly build · 40%Very high · about 160Very high · about 51,000Very high · about 17,000Very high · about 12,000
Dubai Land Residence ComplexAbout half built · 45%Very high · about 150Very high · about 44,000Very high · about 18,000Very high · about 7,600
Dubai MarinaMostly ready · 80%Very high · about 97Very high · about 41,000Very high · about 7,300High · about 3,200
Jumeirah Lakes TowersLargely built · 75%Very high · about 82Very high · about 35,000Medium · about 2,200High · about 2,900
Al FurjanAbout half built · 55%Very high · about 140Very high · about 34,000Very high · about 7,400Very high · about 6,100
Meydan OneMostly ready · 95%Very high · about 130Very high · about 28,000Medium · about 1,900Medium · about 2,300
Downtown DubaiMostly ready · 90%High · about 59Very high · about 26,000High · about 3,700High · about 2,700
Dubai Sports CityMostly ready · 85%Very high · about 96Very high · about 25,000High · about 3,100High · about 3,300
MajanEarly build · 35%Very high · about 110Very high · about 25,000Very high · about 11,000Very high · about 5,500
Dubai Hills EstateLargely built · 75%Very high · about 70Very high · about 23,000Medium · about 2,500High · about 2,800
DAMAC LagoonsLargely built · 65%High · about 38Very high · about 22,000Very high · about 4,800High · about 2,300
ArjanLargely built · 70%Very high · about 78Very high · about 21,000High · about 4,000Very high · about 3,700
Dubai Creek HarbourLargely built · 75%High · about 48Very high · about 20,000Low · about 910Very high · about 3,700
Dubai Production CityLargely built · 60%High · about 63High · about 19,000High · about 4,500High · about 3,400
Al Yelayiss 1Early build · 25%High · about 39High · about 18,000Low · about 770
Jumeirah Village TriangleAbout half built · 50%High · about 66High · about 18,000Very high · about 6,900Very high · about 4,300
City Of ArabiaMostly off-plan · 10%Medium · about 24High · about 17,000Very high · about 12,000Very high · about 4,300
DAMAC Hills 2Largely built · 80%High · about 45High · about 17,000High · about 3,000Low · about 230
Dubai Maritime CityEarly build · 25%High · about 50High · about 17,000High · about 4,400Very high · about 4,100
Dubai Silicon OasisMostly ready · 80%Very high · about 73High · about 16,000High · about 2,900High · about 2,500
Dubai IslandsMostly off-plan · 15%Very high · about 120High · about 15,000Very high · about 9,800High · about 3,300
Town SquareLargely built · 75%High · about 45High · about 15,000Medium · about 2,100Medium · about 1,900
Dubai Investment Park SecondEarly build · 30%Medium · about 34High · about 14,000Medium · about 2,200Very high · about 3,500
Motor CityMostly off-plan · 20%Medium · about 20High · about 14,000High · about 4,700Very high · about 4,000
BukadraEarly build · 30%Medium · about 27High · about 13,000High · about 2,600High · about 3,200
DAMAC HillsMostly ready · 80%High · about 53High · about 13,000Low · about 670Medium · about 1,600
Jaddaf WaterfrontLargely built · 60%High · about 46High · about 13,000High · about 3,700Medium · about 2,200
Palm JumeirahMostly ready · 90%High · about 55High · about 13,000Low · about 1,600Medium · about 1,100
Dubai Science ParkAbout half built · 60%Medium · about 16Medium · about 12,000High · about 4,100High · about 3,000
Al Yufrah 1About half built · 40%Medium · about 33Medium · about 11,000High · about 3,200Low · about 200
Meydan RacecourseEarly build · 30%High · about 47Medium · about 11,000Very high · about 5,600Medium · about 750
LiwanLargely built · 65%Very high · about 70Medium · about 9,600Medium · about 2,500Medium · about 1,400
RukanLargely built · 70%Medium · about 27Medium · about 9,400Medium · about 2,300Low · about 190
City WalkLargely built · 65%High · about 41Medium · about 8,600Low · about 1,100Medium · about 1,500
Jebel AliEarly build · 20%Medium · about 21Medium · about 8,200Medium · about 2,400High · about 2,500
International City Phase 1Mostly ready · 80%Medium · about 32Medium · about 8,100Low · about 1,100Low · about 590
Dubai Investment Park FirstEarly build · 25%Medium · about 24Medium · about 6,100Medium · about 2,000Low · about 680
International City Phase 3About half built · 45%High · about 48Medium · about 5,600Low · about 1,800Medium · about 900
Emirates LivingMostly ready · 100%Medium · about 15Medium · about 5,500
Dubai Studio CityLargely built · 70%Medium · about 19Medium · about 5,300Low · about 1,500Medium · about 1,600
Zaabeel SecondAbout half built · 50%Low · about 11Medium · about 4,400Low · about 560Low · about 520
Ras Al Khor Industrial FirstLargely built · 65%Very low · about 4Medium · about 4,200Medium · about 690
Jumeirah Garden CityEarly build · 35%High · about 38Medium · about 4,100Medium · about 2,500Medium · about 1,300
Wasl 1Largely built · 65%Low · about 7Low · about 4,100Low · about 480Low · about 570
Saih Shuaib 2Mostly off-plan · 15%Medium · about 25Low · about 4,000Medium · about 2,500Medium · about 840
MudonMostly ready · 100%Low · about 13Low · about 3,800Very low · about 28
Barsha HeightsMostly ready · 95%Low · about 13Low · about 3,200Very low · about 41Very low · about 130
The GreensMostly ready · 100%Low · about 12Low · about 2,900Very low · about 120
Umm SuqeimMostly ready · 80%Low · about 12Low · about 2,900Very low · about 240Low · about 480
Me'Aisem SecondMostly off-plan · 20%Low · about 11Low · about 2,600
Trade Center FirstEarly build · 25%Very low · about 4Low · about 2,600Low · about 330
Zaabeel FirstEarly build · 35%Very low · about 2Low · about 2,200Very low · about 140
Palm Jabal AliMostly off-plan · 20%Medium · about 22Low · about 2,100Low · about 1,100Very low · about 180
La MerMostly ready · 90%Medium · about 15Low · about 1,900Low · about 200
Sufouh GardensAbout half built · 55%Low · about 9Low · about 1,900Very low · about 180
Al Yelayiss 5Mostly off-plan · 0%Low · about 5Low · about 1,800
MirdifMostly ready · 90%Low · about 5Low · about 1,600Very low · about 190Very low · about 160
The WorldMostly ready · 85%Low · about 7Low · about 1,600Very low · about 24
Al Rowaiyah FirstMostly off-plan · 0%Very low · about 1Very low · about 1,500
Al SufouhAbout half built · 55%Very low · about 4Very low · about 1,300Low · about 320Very low · about 120
Trade Center SecondMostly off-plan · 10%Very low · about 2Very low · about 840Very low · about 83Low · about 480
Ghadeer Al TairLargely built · 75%Very low · about 2Very low · about 700Very low · about 230
Saih Shuaib 1Mostly off-plan · 0%Very low · about 2Very low · about 590Very low · about 24
Al Barsha FirstLargely built · 65%Very low · about 2Very low · about 580Very low · about 240Very low · about 110
Dubai Water CanalEarly build · 35%Low · about 9Very low · about 510Very low · about 14Low · about 180
BadraMostly ready · 100%Very low · about 2Very low · about 450Very low · about 27
Al QuozMostly ready · 100%Very low · about 1Very low · about 390Very low · about 140
Jumeirah Bay IslandMostly ready · 95%Low · about 5Very low · about 300Very low · about 31
Arabian RanchesMostly ready · 100%Low · about 7Very low · about 230
Dubai Health Care City Phase 1Early build · 35%Very low · about 4Very low · about 190Very low · about 180
Nad Al HamarMostly ready · 85%Very low · about 1Very low · about 60
Al RuwayyahAbout half built · 55%Very low · about 1Very low · about 7Very low · about 39
Al Yelayiss 4Mostly off-plan · 10%Very low · about 1Very low · about 1

Source: Dubai Land Department project register, read 13 Oct 2026, and DLD transaction register, sales registered 28 Apr 2025 to 12 Oct 2026. Figures rounded to two significant figures; bands are fifths of all areas for each measure, and fixed steps of 20 points for stage of development.

Method

Method and sources

Where each ring and light sits

The project register records a location for most projects, either for the project itself or for its buildings. A project is placed at its own location where the register gives one, and otherwise at the first of its buildings with a location. A point shared by 20 or more buildings across the register marks a masterplan rather than a building, so it is never used to place a project. Every project counts towards its area in the table.

No single project is ever marked. Placed projects are grouped into a grid of equal hexagons of about 0.75 km², and an area’s ring sits at the centre of the hexagons holding its projects, weighted by units. An area gets a ring only when it has at least 2 projects with a location. Each close-up light sits at the centre of a smaller hexagon of about 0.25 km² holding at least 2 projects; a project that would sit alone in its small hexagon is counted in the larger one around it, or left to its area’s ring. The same floor of 2 projects applies to every year of the time view.

The stage score

Stage of development is the units in finished projects, plus the units in each project under construction multiplied by its DLD-inspected percentage complete, divided by all the units those projects hold. Each percentage comes from a dated DLD site inspection; the latest on the register is dated 9 Oct 2026. A project under construction with no dated inspection counts towards projects and units and is left out of the stage score.

Cancelled projects, and projects under cancellation, are left out of every measure.

Market figures

Transactions, ticket size and price per sq ft use sales registered from 28 Apr 2025 to 12 Oct 2026 against the projects in the off-plan directory, counting homes only: offices, shops and hotel rooms are excluded at source. Ticket size and price per sq ft are the median of each project’s own median, weighted by its number of sales. A project whose median rests on too few sales is left out of those two figures, and an area or close-up light with fewer than 20 transactions shows no market figure.

Period and source

The time view covers 2008 to 2030. Projects registered before 2008 are counted from 2008. Past years are counted as ready or under construction only, using completion dates; no past percentage is estimated.

All figures come from the Dubai Land Department: its Mashrooi project register for projects, units, status, completion dates and inspected progress, read 13 Oct 2026, and its transaction register for sales. Figures are rounded and banded by Mitchell's Commercial Real Estate. Map data © OpenStreetMap contributors, served as OpenMapTiles.

Questions

Dubai development map questions

What does the Dubai development map show?

The Dubai development map shows where the projects on the Dubai Land Department project register are concentrated and how far along each part of the city is. It covers about 3,200 finished and under-construction projects holding about 930,000 units, register read 13 Oct 2026. Each area is a ring: its size shows the measure you pick, the gold part of the ring the share of units ready and the grey part the share still being built. Zoom in close and the rings give way to small lights, each one a group of at least 2 projects.

Why does the map show areas instead of individual projects?

The map is about how much is being built where, so it shows each area as one ring and never marks a single project. A ring appears only for an area with at least 2 projects, placed at the centre of the areas where its projects sit rather than on any one building. For the projects themselves, each area in the table links to its own page in the off-plan directory.

How is the stage of development worked out?

Units in projects the Dubai Land Department records as finished count as built. Units in projects under construction count at the percentage complete DLD's inspector last recorded, each from a dated site inspection, the latest dated 9 Oct 2026. The built units are divided by all the units those projects hold. Across Dubai the figure is about 60%.

What period does the Dubai development map cover?

The project layers cover the register as read on 13 Oct 2026, and the time slider runs from 2008 to 2030. Years after 2026 use the completion dates on file for projects still under construction and are marked as scheduled. Transactions, ticket size and price per sq ft cover sales registered from 28 Apr 2025 to 12 Oct 2026.

Why do some areas have no ring for transactions or price?

An area needs at least 20 registered sales in the window from 28 Apr 2025 to 12 Oct 2026 before the map shows a transaction count, ticket size or price per sq ft for it. Those areas still have a ring for projects, units, stage of development and handovers due.

Does the map show what is for sale in an area?

No. It shows registered projects, their progress and registered sales. It does not show what is still available in a building or what you would pay for it today. Tell us the areas you are weighing up and we will send you both.

Next step

Talk to us about an area

The map shows where registered supply sits and how far along it is. It does not show what is still available in a building or what comparable units have traded at this month. Tell us the areas you are weighing up and we will send you both, with the projects we would look at first.