Amenities
Imtiaz Developments' factsheet and brochure list the same amenities for the building:
- Clubhouse
- Gym
- Jacuzzi
- Sunken lounge
- Water lounges
- Floating islands
- Water feature
- Outdoor dining and BBQ area
- Outdoor shower
- Outdoor yoga
- Seating zone
- Meeting area
- Private terrace
- Ping pong table
- Kids' playground
The floor plans place the clubhouse and the gym on the second podium floor. The brochure also lists EV charging stations for the building.
Dubai Islands
Imtiaz Developments' brochure gives these figures for Dubai Islands as a whole:
| Dubai Islands |
As stated by Imtiaz Developments |
| Beachfront |
21 km, with Blue Flag Global Accreditation |
| Marinas |
9, including 6 on Island A |
| Hotels and resorts |
86 |
| Golf courses |
2, of 18 and 9 holes |
| Parks and open space |
21,312,522 sq ft (1.98 million sq m) |
Imtiaz Developments' Sunset Bay 3 brochure.
Dubai Islands lies off the Deira coast and is made up of five islands, which Nakheel names Central Island, Marina Island, Shore Island, Golf Island and Elite Island. The neighbourhood mixes hotels and resorts with serviced apartments, mixed-use buildings and waterside villas, and a few resort hotels are already open. The islands also have a marina with berths for yachts and smaller boats, and anchorages where visiting boats can stop for the day or stay overnight.
Building
Imtiaz Developments' brochure describes Sunset Bay 3 as a ground floor, two podium car-parking levels, eight residential floors and a roof. The floor plans draw each level in turn.
- Ground floor. Landscaping and service rooms.
- First podium floor. Car parking.
- Second podium floor. Car parking, the clubhouse and the gym.
- First to seventh floors. Eight units on each floor, four one-bedroom and four two-bedroom.
- Eighth floor. Seven units: two one-bedroom, four two-bedroom and the building's one three-bedroom.
- Roof. The rooftop floor, drawn on its own plan.
Residents park inside the building, on the two podium levels. Every apartment sits above the parking.
Handover
Imtiaz Developments gives completion as February 2027. The month appears on the factsheet and on the payment plan, where the 40% completion payment is tied to it. The Dubai Land Department project register records a planned completion date of 20 March 2027.
The Dubai Land Department recorded construction at 60.04% at its inspection of 17 September 2026.
For selling a unit before handover, our guide to pre-handover assignment in Dubai sets out how it works.
DLD record
The Dubai Land Department registers Sunset Bay 3 as project 3604, "Sunset Bay Three By Imtiaz". It records the project as active and under construction, with 63 units in one building, a start date of 20 March 2025 and a planned completion date of 20 March 2027. Its inspection of 25 June 2026 put construction at 38.26%, and its inspection of 17 September 2026 at 60.04%.
The Dubai Land Department project register names First Abu Dhabi Bank as the escrow agent holding buyer payments, under escrow account 1031226743829005.
Other Imtiaz developments
Other Imtiaz Developments projects on this site include Sunset Bay 2, Sunset Bay 5, Beach Walk Residence 4, Beach Walk Grand, Cove Edition 3, Cove Edition 4 and Cove Edition 5.
The other Sunset Bay buildings on this site also include Sunset Bay and Sunset Bay 4.