Amenities
Imtiaz's factsheet and brochure each list fifteen amenities, sixteen between them. The outdoor cinema is on the factsheet only and the water feature on the brochure only:
- Clubhouse
- Gym
- Jacuzzi
- Sunken lounges
- Water lounges
- Floating islands
- Water feature
- Outdoor cinema
- Outdoor dining and BBQ area
- Outdoor shower
- Outdoor yoga
- Seating zone
- Meeting area
- Private terrace
- Ping pong table
- Kids' playground
The floor plans place the clubhouse and the gym on the second podium floor, which carries no apartments. The first podium floor holds the upper level of the duplexes, and the building ends in a rooftop floor.
Dubai Islands
Imtiaz's brochure gives these figures for Dubai Islands as a whole:
| Dubai Islands |
As stated by Imtiaz |
| Beachfront |
21 km, with Blue Flag Global Accreditation |
| Marinas |
9, including 6 on Island A |
| Hotels and resorts |
86 |
| Golf courses |
2, of 18 and 9 holes |
| Parks and open space |
21,312,522 sq ft (1.98 million sq m) |
Imtiaz's Sunset Bay 2 brochure.
The figures describe the island around the building.
Building
Imtiaz's brochure describes Sunset Bay 2 as a ground floor, two podium car-parking levels, eight residential floors and a roof. The architect's elevation in the brochure titles it a proposed residential building of that configuration.
- Ground floor. The lower level of the three-bedroom duplexes.
- First podium floor. Car parking, and the upper level of the duplexes.
- Second podium floor. Car parking, the clubhouse and the gym.
- Residential floors. One and two-bedroom apartments on two alternating typical layouts.
- Roof. The rooftop floor, drawn on its own plan.
Residents park inside the building, on the two podium levels.
Handover
Imtiaz gives completion as January 2027. The date appears on the factsheet and on the payment plan, where the 40% completion payment is tied to it. The Dubai Land Department project register records a planned completion date of 20 February 2027.
The Dubai Land Department inspected the site on 4 August 2026 and recorded construction at 70.2%.
For selling a unit before handover, our guide to pre-handover assignment in Dubai sets out how it works.
DLD record
The Dubai Land Department registers Sunset Bay 2 as project 3570, "Sunset Bay Two By Imtiaz". It records the project as active and under construction, with 66 units in one building, a start date of 20 February 2025 and a planned completion date of 20 February 2027. Its inspection of 4 August 2026 put construction at 70.2%.
The Dubai Land Department project register names First Abu Dhabi Bank as the escrow agent holding buyer payments, under escrow account 1011225608110046.
Other Imtiaz developments
Other Imtiaz projects on this site include Sunset Bay 5, Sunset Bay 3, Beach Walk Residence 4, Beach Walk Grand, Cove Edition 5, Cove Edition 4 and Cove Edition 3.
The other Sunset Bay buildings on this site also include Sunset Bay and Sunset Bay 4.