Fully furnished studios, one and two-bedroom apartments at Cove Edition 5 in Dubai Land Residence Complex
Cove Edition 5 is a residential building by Imtiaz Developments in Dubai Land Residence Complex, Dubailand. It rises over two basement levels, a ground floor, eleven residential floors and a roof, and it holds studios, one-bedroom and two-bedroom apartments. Imtiaz sells every unit fully furnished. Imtiaz's payment plan gives completion as June 2027, and the Dubai Land Department project register records a planned completion of 20 May 2027. There are two payment plans: a 50/50 plan, and a plan that moves 30% of the price to the three years after handover.
Studios are most of the building. Imtiaz's unit schedule lists 132 studios, 55 one-bedroom apartments and 11 two-bedroom apartments.
The shared amenities are on the roof. Imtiaz's roof-floor drawing shows a gym, a clubhouse, a pool deck with an adult pool, a cabana and a sitting garden, and the brochure and factsheet describe the pool as an infinity pool.
The Dubai Land Department project register names Dubai Islamic Bank as the escrow agent holding buyer payments, under escrow account 001640253507001.
Nearby
Cove Edition 5 is in Dubai Land Residence Complex, in Dubailand. Imtiaz's factsheet and its brochure give the same drive times to three destinations:
| Destination |
Drive time |
| Dubai Outlet Mall |
5 minutes |
| Academic City |
5 minutes |
| Dubai International Airport |
20 minutes |
Drive times as given by Imtiaz in both the Cove Edition 5 factsheet and the brochure.
For a resident, that puts an outlet mall and a university district within five minutes and the airport within twenty. Imtiaz lists nearness to universities among the building's features, and Academic City is the university district its location table names. It also describes Cove Edition 5 as a family-friendly community, and a kids' playground is on its amenity list.
Our Dubai Land Residence Complex investment guide covers the wider community: its road links, schools and the other buildings in it. Every project brief we publish in the community is listed on the Dubai Land Residence Complex projects page.
Units
Imtiaz builds three unit types at Cove Edition 5.
Studios, 372 to 451 sq ft. With 132 of them, studios are the core of the building. The largest is 79 sq ft bigger than the smallest, so two studios on the same floor can differ by about a fifth in size.
One-bedroom apartments, 738 to 1,085 sq ft. There are 55, and the range is wide. The largest one-bedroom is 347 sq ft bigger than the smallest, which is nearly the size of a studio. At 1,085 sq ft, the largest one-bedroom is 222 sq ft short of a two-bedroom.
Two-bedroom apartments, 1,307 sq ft. There are 11, and Imtiaz lists them all at one size. They are the scarcest unit in the building, and the only type with a second bedroom.
Imtiaz's floor plans set out the ground floor, the typical residential floor from the 1st to the 11th, and the roof. The typical floor shows each unit's type and position on the plate.
Post-handover payment plan
Imtiaz offers two plans on Cove Edition 5, and both start with 20% on booking.
On the 50/50 plan, six instalments of 5% during construction take the total paid before completion to 50%. The other 50% falls due on completion in June 2027.
The second plan, which Imtiaz calls 3 years post handover, moves 30% of the price to after the keys are handed over:
| Instalment |
Payment |
Due |
| Booking |
20% |
On booking |
| Second instalment |
5% |
During construction |
| Third instalment |
5% |
During construction |
| Fourth instalment |
10% |
During construction |
| Fifth instalment |
10% |
During construction |
| Sixth instalment |
5% |
During construction |
| Completion |
15% |
June 2027, on completion |
| After handover |
30% |
2.5% each quarter for three years |
Both plans per Imtiaz's Cove Edition 5 factsheet and its payment plan, which give identical percentages. Each plan totals 100%.
On the post-handover plan you pay 55% during construction, 5% more than on the 50/50 plan, and in return the payment due on completion falls from 50% to 15%. The remaining 30% is spread over twelve quarterly payments of 2.5% after handover.