A 13-floor apartment tower in Wadi Al Safa 5, Dubailand
Verdania 1 is Object One's residential tower in Wadi Al Safa 5, part of the Dubai Land Residence Complex, Dubai. Object One's brochure describes it as a 2B+G+13+R building — two basement levels, a ground floor, 13 residential floors and a roof amenity level — carrying the tagline "A Green Sanctuary for Modern Living". Counting every one of those levels comes to 17, the same figure the DLD project register gives independently as the building's total floor count. The developer's own name for the project, Verdania, is drawn from verde, the word for green in several languages.
The DLD project register records Verdania 1 under project number 3543, developed by Obj1 Real Estate Development L.L.C., DLD developer number 1894 — the same developer number carried by Verdania 2 and Verdania 4. Construction started on 25 March 2025, ahead of the project's registration on 4 June 2025. As at 18 June 2026, the register recorded construction 16.67% complete. The register names Abu Dhabi Islamic Bank as the escrow agent holding buyer payments, under escrow account 19438427.
Object One's brochure and payment plan both give Q1 2027 as the anticipated handover, with the final construction instalment falling due in March 2027 — a date the DLD project register independently confirms.
Construction progress
The DLD project register records four inspections of Verdania 1 since construction started. The register found the site at 0% on its first inspection, 26 May 2025. By 28 July 2025 it recorded 3.02% complete, rising to 12.28% at the inspection of 24 February 2026. The most recent inspection on record, 18 June 2026, put the building at 16.67% complete — the fastest progress of Object One's three Verdania towers at the same point in the register's history.
DLD project register (project #3543), inspection history, checked 27 September 2026.
Post-handover payment plan
Object One also offers a post-handover schedule on Verdania 1, carrying the same booking deposit and construction instalments as the standard plan, then splitting the balance across and after completion.
| Stage |
Payment |
| Booking deposit |
24% |
| During construction |
6% |
| During construction |
10% |
| During construction |
10% |
| During construction |
10% |
| On completion |
4% |
| After handover |
36% |
Object One's post-handover payment plan, Verdania 1.
Object One's payment plan states a 4% DLD registration fee plus a fixed AED 5,050 registration charge on both plans.
Amenities
Object One's brochure lists Verdania 1's shared facilities: a lobby, swimming pool, kids' pool, a pool deck with sun loungers, an outdoor kids' play area and a dedicated kids' play room, a gym, a yoga area, a sauna, a cinema and a clubhouse. The developer's own roof-floor plan lays these out around two pools: a family swimming pool and a separate kids' pool, both with sun loungers, alongside a clubhouse room, a cinema, a gym with a separate sauna, an outdoor CrossFit area, a yoga corner and an outdoor kids' play area.