Studios to three-bedroom apartments and lofts at Mirdad, Motor City
Mirdad is a residential development by Union Properties in Motor City, Dubai. It has four residential towers and a retail plaza, and Union Properties describes more than 26 amenities across the podium, the ground floor and the basement. Union Properties gives completion as Q4 2028.
Launch price. Union Properties' launch presentation, a file dated October 2025, listed studios from AED 799,000 and three-bedroom apartments from AED 2,815,000. The presentation prints no date of its own. Over the smallest studio's 377.38 sq ft of total area, the studio price was about AED 2,200 per sq ft.
Payment plan. A 20% down payment, six instalments of 5% and 50% on completion.
Construction at 6.02%. The Dubai Land Department recorded construction at 6.02% at its inspection of 28 September 2026.
Homes and launch prices
Union Properties' launch presentation lists a starting price and a size range for each home type. The sizes below are the total areas printed on the tower layouts, read for every type in all four towers. The presentation is a file dated October 2025 that prints no date of its own, so the prices were the launch figures.
| Home type |
Total area, sq ft |
Starting price, AED |
| Studio |
377.38 to 510.86 |
799,000 |
| One-bedroom |
628.07 to 977.15 |
1,300,000 |
| One-bedroom plus |
760.69 to 1,080.91 |
1,490,000 |
| Two-bedroom |
997.71 to 1,640.85 |
1,960,000 |
| Two-bedroom plus |
1,236.24 to 1,757.53 |
2,430,000 |
| Three-bedroom |
1,450.65 to 2,262.25 |
2,815,000 |
| Loft |
895.88 to 3,169.11 |
1,630,000 |
Prices per Union Properties' launch presentation, "Indicative Unit Sizes & Prices", file dated October 2025. Areas are "Total Area" as printed on the tower layouts.
Over the smallest studio's total area of 377.38 sq ft, the studio's starting price was about AED 2,200 per sq ft.
The layouts show each plan by tower and level, with the unit numbers that share it and the view each side faces, so a reader can see which floors carry which plan. The smallest studio plan has no balcony. The one-bedroom-plus plans add a multipurpose room.
Amenities
Union Properties' launch presentation lists more than 26 amenities, grouped as follows.
- Sports: half-Olympic lap pool, two padel courts, three gyms, a sports complex and squash courts
- Communal areas: three multipurpose halls, a coworking space, a community clubhouse, an indoor cinema and two pool lounges
- Kids: two shaded play areas, a kids' play area and a gaming zone, plus a kids' party hall on the ground floor
- Leisure: two spas, a pocket zen garden and yoga lawn, a golf simulator and two pocket pet parks with seating
The presentation places the pools, padel court, gyms, clubhouse, social lounge, spas and play areas on the podium level, and the coworking space, golf simulator, game room, cinema and multipurpose lounges on the ground floor beside the retail plaza. The squash courts and a multipurpose court are on the second basement level. Union Properties' brochure adds electric-vehicle charging stations in the car park, 24-hour security and concierge services, a sky garden and barbecue areas.
Nearby
Mirdad is in Motor City, a community Union Properties describes as sitting at the intersection of two major highways in the centre of Dubai. Our investment guide to the community covers it in more depth.
Union Properties gives these journey times:
- Malls: 13 minutes to Dubai Hills Mall, 18 to Mall of the Emirates, 20 to Dubai Marina Mall and 24 to Dubai Mall
- Schools: 5 minutes to GEMS Metropole School, 9 to Nord Anglia International School Dubai, 10 to Kings' School Al Barsha and 16 to Dubai American Academy
- Landmarks: 20 minutes to Burj Al Arab, 22 to the Museum of The Future, and 24 to both Dubai International Airport and Al Maktoum International Airport
The presentation also places the project steps from Dubai Autodrome and Kartdrome, and names Hessa Street, Umm Suqeim Street and Sheikh Mohammed bin Zayed Road as its main connections.
Every project brief we publish in the area is listed on the Motor City projects page.
DLD record
The Dubai Land Department registers Mirdad as project 4158, "Mirdad", in Al Hebiah First. It records the project as active and under construction, registered on 29 October 2025 with a start date of 1 August 2025 and an end date of 31 December 2028. Its buildings are Mirdad 1, Mirdad 2, Mirdad 3, Mirdad 4 and Mirdad Plaza. The register's inspections put construction at 0.27% on 24 October 2025, 2.83% on 19 June 2026 and 6.02% on 28 September 2026. The escrow agent on the register is Dubai Islamic Bank.