Symbolic Altus in Wadi Al Safa 2
Symbolic Altus is a single apartment building by Symbolic Real Estate Development L.L.C in Wadi Al Safa 2, Dubai. It is a mid-rise residential block of 108 units and is under construction. The design limits the number of units on each floor, and planting is specified for the balconies and outdoor areas.
The building and units
The units are apartments in two types: one bedroom and two bedroom.
Interiors are specified in a neutral off-white palette. Tiled flooring is specified for every unit, with marble worktops, bespoke light fittings and floating ceilings among the named finishes. The kitchen specification lists gas hobs, built-in appliances and storage; bathrooms are specified with rainfall showers in walk-in enclosures, vanity mirrors with backlighting and fitted storage.
The amenities named for the project are a rooftop infinity pool, pool cabanas, a rooftop lounge, a gym, a Jacuzzi, a steam room and a sauna. They are specified, not yet built.
Location
Wadi Al Safa 2 sits within DubaiLand. It has 16 sub-communities at different stages, including Liwan, Liwan 2, Q1 Mall and Falconcity of Wonders. Symbolic Alpha, a completed building, is also in the area.
Three parks are very close to Symbolic Altus: Liwan Soccer Park at 0.1 km, Liwan 2 Fitness Park at 0.3 km and Liwan 2 Activity Park at 0.5 km. Q1 Mall is 0.7 km away, with a gym and a pharmacy among its outlets. Further out, IMG Worlds of Adventure is 5.4 km away and Global Village is 7.3 km. The Track Meydan Golf is 8.9 km away.
Two schools lie within 2 km: GEMS FirstPoint School at 1.6 km and Lycee Francais International Georges Pompidou at 1.7 km. The neighbouring community of The Villa is 1.9 km from the building.
DLD register status
The Dubai Land Department register, read 7 November 2026, holds Symbolic Altus as project number 4126. Its status is active and its label is under construction. The register gives construction as 1.3% complete as at 8 May 2026 and a start date of 1 October 2025. The projected completion date is 1 May 2027; that is the Dubai Land Department's projected date and not a handover commitment. The register names The National Bank Of Fujairah P S C as escrow agent.