A 12-storey apartment building in Jumeirah Garden City
Enso Jade is a single residential building being built in Jumeirah Garden City, within the Al Satwa district of central Dubai. It is designed at 12 storeys, with apartments of one, two or three bedrooms.
The building and units
The design gives each floor a 3.3 metre floor-to-ceiling height, and the outer walls are full-height glazed curtain walling. Bedrooms are specified with their own bathrooms and walk-in closets. Bathrooms are specified with toiletry recesses set flush into the wall and a bench inside the shower.
Kitchens. The specification lists matt melamine cabinets with Italian artificial marble worktops, and a fitted appliance set of refrigerator, cooking range with oven, extractor hood, washer-dryer and dishwasher.
Bathrooms. Matt melamine cabinets, mirrors in high-pressure laminate and UAE-made WCs are specified.
Floors and joinery. Floors are Italian porcelain tile throughout. Door frames and shutters are high-pressure laminate melamine in a wood finish, wardrobes are laminate melamine in a textured finish, and the glass is UAE-made.
Shared facilities. The facilities listed for the project are a swimming pool, a gym, an outdoor gymnasium, a climbing wall, a jogging track, a steam room, a zen garden, barbecue facilities, sun loungers, bicycle storage and parking. Large balconies, fitted kitchens and smart technology are also named for the apartments.
Location
Jumeirah Garden City sits within Al Satwa, an older Dubai district that Dubai Municipality has opened to taller buildings. Under its revised rules, a plot on an internal road may take a ground floor plus two residential storeys, while a plot on an external road may put shops at ground level and two or three residential storeys over them, in each case subject to planning approval. Where a plot, or an approved combination of plots, measures at least 1,000 square metres, the owner may build a ground floor plus eight residential storeys. Satwa has also moved from long-term leasehold towards a freehold scheme, which lets developers create projects carrying multiple title deeds.
Around the building, it is 0.4 km to Jumeirah Garden City Park, also 0.4 km to the community's Central Park, and 0.5 km to Al Satwa Public Park. Jumeira Baccalaureate School is 1.4 km from the building.
The wider centre of the city is close by. It is 0.8 km to the Museum of the Future and 1.0 km to the Dubai International Financial Centre. Jumeirah Mosque is 1.8 km away. City Walk and the La Mer beachfront are both 2.0 km away, with Downtown Dubai at 2.6 km and Business Bay at 3.8 km. For films, the Roxy screens at The Hub in City Walk are 1.7 km away.
DLD register status
The Dubai Land Department register, read 14 November 2026, lists the project as active, with the label under construction. It shows the project 42.13% complete as at 14 July 2026, and gives a projected completion date of 30 June 2026.