Palm Jumeirah AED 3,558/sqftDubai Maritime City AED 3,155/sqftDowntown Dubai AED 2,890/sqftDubai Islands AED 2,772/sqftDubai Creek Harbour AED 2,563/sqftBusiness Bay AED 2,504/sqftDubai Marina AED 2,481/sqftDubai Hills Estate AED 2,458/sqftJumeirah Lakes Towers AED 2,321/sqftMohammed Bin Rashid City AED 2,098/sqftAl Jaddaf AED 2,054/sqftJumeirah Village Triangle AED 1,661/sqftDubai South AED 1,652/sqftArjan AED 1,584/sqftJumeirah Village Circle AED 1,488/sqftDubai Sports City AED 1,328/sqftALL DLD SALES · OFF-PLAN + EXISTINGPalm Jumeirah AED 3,558/sqftDubai Maritime City AED 3,155/sqftDowntown Dubai AED 2,890/sqftDubai Islands AED 2,772/sqftDubai Creek Harbour AED 2,563/sqftBusiness Bay AED 2,504/sqftDubai Marina AED 2,481/sqftDubai Hills Estate AED 2,458/sqftJumeirah Lakes Towers AED 2,321/sqftMohammed Bin Rashid City AED 2,098/sqftAl Jaddaf AED 2,054/sqftJumeirah Village Triangle AED 1,661/sqftDubai South AED 1,652/sqftArjan AED 1,584/sqftJumeirah Village Circle AED 1,488/sqftDubai Sports City AED 1,328/sqftALL DLD SALES · OFF-PLAN + EXISTING
DLD · MEDIAN 12M TO OCT 2026
Eira — Dubai Production City — Mitchell's Commercial Real EstateOFF-PLAN

Neoterra DPC Developments

Eira

Dubai Production City · Dubai

Eira by Neoterra Developments in Dubai Production City: studio and 1-bedroom apartments in one building, with a 50/50 plan running 4 years past possession.

The homesStudios · 1-bedroom apartmentsThe unit mix below has the detail per type.
Starting priceAED 960kStarting price as published by Neoterra DPC Developments, July 2026 (file dated). Source: 1 Bed Residences starting price, Neoterra Developments mini brochure, file dated July 2026.
Payment plan50 / 50As published for this project, with 50% due on completion.
Book a private briefing

Unit mix, sizes, prices and the payment plan are Neoterra DPC Developments' own, as published in this brief.

At a glance

Project summary

6 lines
Developer
Neoterra DPC Developments
Community
Dubai Production City, Dubai
Status
Off-plan
Unit mix
Studios · 1-bedroom apartmentsEvery type published in this brief’s unit mix.
Payment plan
50 / 50As published for this project, with 50% due on completion.
Starting price
AED 960kStarting price as published by Neoterra DPC Developments, July 2026 (file dated). Source: 1 Bed Residences starting price, Neoterra Developments mini brochure, file dated July 2026.

Documents

Documents

Free · no sign-up

Download any document directly — no form, no sign-up. We keep the resources open so you can review the detail on your own terms.

Unit mix

11 types, as published in this brief.
TypeInternal area (sq ft)Balcony area (sq ft)Total area (sq ft)Actions
Studio Type 1293 - 29751 - 62344 - 356
Studio Type 229596391
Studio Type 333052382
Studio Type 435469423
1 Bed Type 1555 - 574130 - 132687 - 705
1 Bed Type 2577 - 602101 - 144678 - 746
1 Bed Type 3588130718
1 Bed Type 4592 - 593124716 - 717
1 Bed Type 554590635
1 Bed Type 6569 - 575109 - 126683 - 695
1 Bed Type 7643 - 667162 - 164807 - 829
Ask about

Areas as printed on the unit plan pages of Neoterra's brochure, where total area is internal area plus balcony area. Neoterra marks the plans as indicative.

Payment structure

Payment schedule

The schedule as published for this project, totalling 100% of the purchase price. Percentages apply to whichever price is agreed for the unit selected.

Cumulative share of purchase price — each block is one instalment
First instalment: 50%Cumulative at final instalment: 100%
InstalmentShareCumulative
Until possession50%50%
Over 4 years post possession50%100%
Total100%

Payment plan as printed under the heading "Post handover payment plan" on Neoterra's mini brochure, file dated 7 July 2026. RERA BRN 68593.

The brief

About this project

Eira apartments in Dubai Production City

Eira is a residential building by Neoterra Developments in Dubai Production City, Dubai. Neoterra's brochure presents a collection of studios and 1-bedroom apartments and gives the location as the heart of Production City, beside two lakes and a 2-acre green park. The Dubai Land Department register records 271 homes in the project.

Neoterra's mini brochure, file dated July 2026, gives 1 Bed Residences starting at AED 960,000. Its payment plan is 50% until possession and 50% over 4 years post possession. The register records a planned completion of 30 June 2029.

Neoterra's brochure names GRID as Development Lifecycle Management Partner on the project. It also names the building's arrival experience Grandé Maison by GRID.

Starting price
1 Bed Residences starting at AED 960,000, as published by Neoterra Developments, July 2026 (file dated)
Payment plan
50% until possession, 50% over 4 years post possession
Location
Dubai Production City, Dubai
Type
Residential building of studios and 1-bedroom apartments
Homes
271 per the Dubai Land Department register
Completion
Recorded by the DLD project register as 30 June 2029, the filed planned completion
DLD project number
4437

Unit counts and the completion date come from the Dubai Land Department register. The price and payment plan are as printed on Neoterra's mini brochure, file dated 7 July 2026.

Homes

Neoterra's brochure describes the collection as limited and shows eleven plan types: four studios and seven 1-bedroom layouts. Each plan page gives internal area, balcony area and total area, with a key plan showing where the type sits in the building.

Studios, 344 to 423 sq ft in total area. Internal areas run from 293 to 354 sq ft. Neoterra describes adaptable seating arrangements, a fold-and-tuck kitchen design, private balconies opening to greenery and efficient layouts. Studio Type 2 has the largest balcony of the studio types at 96 sq ft.

1-bedroom apartments, 635 to 829 sq ft in total area. Internal areas run from 545 to 667 sq ft. Neoterra describes a dedicated foyer, a bedroom suite with a walk-in wardrobe and ensuite bath, a social kitchen with integrated breakfast seating, a guest powder room, a dedicated workspace and a balcony extending across the living and sleeping spaces.

Interiors. Neoterra's specification lists porcelain bathroom walls and floors, frameless glass shower screens, ceiling-mounted shower heads, bespoke fitted wardrobes in all bedrooms and fully fitted kitchens with stone worktops. Kitchens include an integrated fridge freezer, a microwave-oven combination, a combi washer dryer and a recirculating hood. The hob is 30 cm in studios and 60 cm in 1-bedroom residences.

Building. The specification lists district cooling, EV chargers for selective parking, audio door entry, controlled access, 24-hour security and CCTV across common areas. The entrance lobby has a concierge desk, polished stone flooring and timber feature panels.

Amenities

Neoterra's brochure lists more than 25 amenities across two levels. Its floor plans show them on the ground floor and on a terrace level.

  • Ground floor: a temperature-controlled family swimming pool, sunken seating with a fire pit, a kids' pool, a pool bar with barbecue area, male and female saunas and changing rooms, a pet park, a children's play park, the Lotus water feature, the Serenity Walkway and hangout hubs
  • Terrace level: a gym, aerial yoga, a terrace co-working lounge, a reflexology pathway, an outdoor lounge, hammocks, a stargazing pavilion, a yoga lounge, a jogging track, six-hole golf and cabanas

The brochure gives the Serenity Walkway as a promenade of about 62 m, or about 100 steps. It describes landscaping of more than 14 plant species.

Nearby

Eira is in Dubai Production City, which Neoterra's brochure describes as spanning over 43 million sq ft, with direct access via E311 and Al Khail Road. Our Dubai Production City investment guide covers the community in more depth, and every project brief we publish there is listed on the Dubai Production City projects page.

Neoterra's brochure and mini brochure give these travel times in minutes:

  • Healthcare: 3 minutes to Mediclinic Me'aisem and 9 minutes to NMC Royal Hospital
  • Education: 10 minutes to Gems Metropole School, 11 minutes to Arcadia British School and 12 minutes to Dubai British School
  • Sports and leisure: 10 minutes to Dubai International Stadium, 12 minutes to Dubai Autodrome, 14 minutes to Trump International Golf Club and 15 minutes to Marina Beach
  • Retail and lifestyle: 3 minutes to City Centre Mall, 15 minutes to Dubai Hills Mall, 16 minutes to Dubai Internet City, 17 minutes to Global Village, 17 minutes to Dubai Marina Mall and 18 minutes to Mall of the Emirates

DLD record

The Dubai Land Department register lists Eira as project 4437, with Neoterra Dpc Developments L.L.C as the developer of record. It records 271 homes, a start date of 10 September 2026 and a filed planned completion date of 30 June 2029.

Location

Area and connectivity

Eira is in the Dubai Production City area.

Location record
Area
Dubai Production City

Area and community are from our own project record.

Area and community: our own project record. Neither is a survey.

Location

Eira — Dubai Production City

Get Directions

Book a private briefing

Book Now
The developer

Neoterra DPC Developments

Neoterra DPC Developments is the developer named on this brief.

Got questions?

Get Answers!
Questions

Common questions

Where is Eira?

Eira is in Dubai Production City, Dubai. Neoterra Developments' brochure places it beside two lakes and a 2-acre green park, with direct access via E311 and Al Khail Road, and gives 3 minutes to City Centre Mall and 3 minutes to Mediclinic Me'aisem.

Our Dubai Production City investment guide covers the community in more depth.

What homes are in Eira?

Neoterra's brochure lists studios and 1-bedroom apartments in one building. Studio total areas run from 344 to 423 sq ft and 1-bedroom total areas from 635 to 829 sq ft, each as internal area plus balcony area. The Dubai Land Department register records 271 homes.

What is the starting price at Eira?

Neoterra Developments' mini brochure, file dated July 2026, gives 1 Bed Residences starting at AED 960,000.

What is the payment plan at Eira?

Neoterra's mini brochure, file dated July 2026, prints a post-handover plan of 50% until possession and 50% over 4 years post possession.

When is Eira due to complete?

The Dubai Land Department register records a planned completion of 30 June 2029 for Eira, project 4437.

What amenities does Eira have?

Neoterra's brochure lists more than 25 amenities across two levels, the ground floor and a terrace level. They include a temperature-controlled family swimming pool, a kids' pool, a pool bar, saunas and steam rooms, a gym, a co-working space, a jogging track and six-hole golf.

Small print

Sources

Every figure on this page is traceable
  • Neoterra Developments, Eira brochure, 47 pages. Source for: the collection, unit plan areas, specification, amenities, location description, travel times and GRID's role.
  • Neoterra Developments, Eira mini brochure, 4 pages, file dated 7 July 2026. Source for: the 1 Bed Residences starting price and the payment plan. The date is the file's creation date, not a date printed in the document.
  • Neoterra Developments, Eira floor plans, 4 pages, file dated 30 June 2026. Source for: the ground-floor and terrace-level amenity plans.
  • Dubai Land Department register, via Mitchell's DLD pipeline, project 4437. Source for: the register name, developer of record, 271 homes, start date and filed planned completion.

Next step

Enquire about this project

Tell us what you are looking for and we’ll come back with what is actually available, at what price, and the payment terms attaching to it.

Book a private briefing
Need help?