Eira apartments in Dubai Production City
Eira is a residential building by Neoterra Developments in Dubai Production City, Dubai. Neoterra's brochure presents a collection of studios and 1-bedroom apartments and gives the location as the heart of Production City, beside two lakes and a 2-acre green park. The Dubai Land Department register records 271 homes in the project.
Neoterra's mini brochure, file dated July 2026, gives 1 Bed Residences starting at AED 960,000. Its payment plan is 50% until possession and 50% over 4 years post possession. The register records a planned completion of 30 June 2029.
Neoterra's brochure names GRID as Development Lifecycle Management Partner on the project. It also names the building's arrival experience Grandé Maison by GRID.
Homes
Neoterra's brochure describes the collection as limited and shows eleven plan types: four studios and seven 1-bedroom layouts. Each plan page gives internal area, balcony area and total area, with a key plan showing where the type sits in the building.
Studios, 344 to 423 sq ft in total area. Internal areas run from 293 to 354 sq ft. Neoterra describes adaptable seating arrangements, a fold-and-tuck kitchen design, private balconies opening to greenery and efficient layouts. Studio Type 2 has the largest balcony of the studio types at 96 sq ft.
1-bedroom apartments, 635 to 829 sq ft in total area. Internal areas run from 545 to 667 sq ft. Neoterra describes a dedicated foyer, a bedroom suite with a walk-in wardrobe and ensuite bath, a social kitchen with integrated breakfast seating, a guest powder room, a dedicated workspace and a balcony extending across the living and sleeping spaces.
Interiors. Neoterra's specification lists porcelain bathroom walls and floors, frameless glass shower screens, ceiling-mounted shower heads, bespoke fitted wardrobes in all bedrooms and fully fitted kitchens with stone worktops. Kitchens include an integrated fridge freezer, a microwave-oven combination, a combi washer dryer and a recirculating hood. The hob is 30 cm in studios and 60 cm in 1-bedroom residences.
Building. The specification lists district cooling, EV chargers for selective parking, audio door entry, controlled access, 24-hour security and CCTV across common areas. The entrance lobby has a concierge desk, polished stone flooring and timber feature panels.
Amenities
Neoterra's brochure lists more than 25 amenities across two levels. Its floor plans show them on the ground floor and on a terrace level.
- Ground floor: a temperature-controlled family swimming pool, sunken seating with a fire pit, a kids' pool, a pool bar with barbecue area, male and female saunas and changing rooms, a pet park, a children's play park, the Lotus water feature, the Serenity Walkway and hangout hubs
- Terrace level: a gym, aerial yoga, a terrace co-working lounge, a reflexology pathway, an outdoor lounge, hammocks, a stargazing pavilion, a yoga lounge, a jogging track, six-hole golf and cabanas
The brochure gives the Serenity Walkway as a promenade of about 62 m, or about 100 steps. It describes landscaping of more than 14 plant species.
Nearby
Eira is in Dubai Production City, which Neoterra's brochure describes as spanning over 43 million sq ft, with direct access via E311 and Al Khail Road. Our Dubai Production City investment guide covers the community in more depth, and every project brief we publish there is listed on the Dubai Production City projects page.
Neoterra's brochure and mini brochure give these travel times in minutes:
- Healthcare: 3 minutes to Mediclinic Me'aisem and 9 minutes to NMC Royal Hospital
- Education: 10 minutes to Gems Metropole School, 11 minutes to Arcadia British School and 12 minutes to Dubai British School
- Sports and leisure: 10 minutes to Dubai International Stadium, 12 minutes to Dubai Autodrome, 14 minutes to Trump International Golf Club and 15 minutes to Marina Beach
- Retail and lifestyle: 3 minutes to City Centre Mall, 15 minutes to Dubai Hills Mall, 16 minutes to Dubai Internet City, 17 minutes to Global Village, 17 minutes to Dubai Marina Mall and 18 minutes to Mall of the Emirates
DLD record
The Dubai Land Department register lists Eira as project 4437, with Neoterra Dpc Developments L.L.C as the developer of record. It records 271 homes, a start date of 10 September 2026 and a filed planned completion date of 30 June 2029.