APARTMENTS AND TOWNHOUSES NEAR CREEK BEACH ON DUBAI CREEK
Arlo is a residential development by Emaar at Dubai Creek Harbour, the master-planned waterfront district along the historic Dubai Creek, near the Ras Al Khor Wildlife Sanctuary and set around a marina and central park, with connections into Downtown Dubai. Arlo sits in a district near Creek Beach, alongside a scenic waterfront promenade, with an adventure playground, cycling track, skate park and sports courts nearby, and connections to the RTA ferry terminal and metro station.
The development offers 1, 2 and 3-bedroom apartments, along with 3-bedroom townhouses. Per the Emaar floor plans, one-bedroom homes have a suite area of 650 to 654 sq ft (705 to 829 sq ft including balcony), two-bedroom homes 1,098 to 1,107 sq ft (1,208 to 1,261 sq ft including balcony), three-bedroom apartments 1,522 sq ft (1,745 sq ft including balcony) and the three-bedroom townhouses 2,146 to 2,157 sq ft, rising to 3,262 to 3,275 sq ft with their terraces. Homes are designed with large balconies that extend the living spaces into the surrounding parkland and waterways, and ground-floor units enjoy direct access to the creek promenade. Starting prices are from AED 1.70 million (PropSearch launch data).
Emaar has structured the launch around a construction-linked payment plan — 10% on booking, 80% across the construction period and the final 10% on handover, scheduled for Q4 2028.
PROJECT SUMMARY
| Project | Arlo |
| Developer | Emaar |
| Community | Dubai Creek Harbour (near Creek Beach) |
| Type | 1–3 Bedroom Apartments & 3-Bedroom Townhouses |
| Total units | Approx. 431 (per PropSearch) |
| Starting price | From AED 1.70 million (per PropSearch) |
| Payment plan | Construction-linked (10% down / 80% during / 10% on handover, per PropSearch) |
| Expected completion | Q4 2028 (per PropSearch) |
Sizes per the Emaar floor plans; commercial terms per PropSearch launch data, subject to change if there are future releases.
UNIT MIX & SIZES
| Unit type | Suite area (sq ft) | Total area incl. balcony (sq ft) | Starting price (AED) |
|---|---|---|---|
| 1-Bedroom | 650 – 654 | 705 – 829 | 1.70M |
| 2-Bedroom | 1,098 – 1,107 | 1,208 – 1,261 | 2.75M |
| 3-Bedroom | 1,522 | 1,745 | 4.80M |
| 3-Bedroom Townhouse | 2,146 – 2,157 | 3,262 – 3,275 | Confirmed on request |
Areas per the Emaar floor plans (ARLO_DCH_FLOOR_PLANS.pdf); the set publishes both a suite area and a total area including balcony or terrace, and both are shown here. Emaar's floor plans note that actual area may vary from the stated area. The Emaar pack does not publish per-type prices or a unit count: starting prices are PropSearch launch data, which recorded a range of AED 1.70M to AED 5.60M and a canal-view two-bedroom from AED 3.45M.
THE INVESTMENT CASE
Arlo is an off-plan, standard-tier brief: the angle below is qualitative. Where the live Dubai Land Department transaction feed for Dubai Creek Harbour is available, current pricing and PSF trends will be shown alongside — those figures are the basis for any comparison, not the estimates below.
DEVELOPER: EMAAR, ONE OF DUBAI'S MOST ESTABLISHED DEVELOPERS
Arlo is developed by Emaar, the developer behind many of Dubai's landmark destinations. Emaar reported revenue of AED 49.6 billion for 2025 and, with a proven delivery track record, has delivered over 125,600 residential units across Dubai and other global markets since 2002. Its portfolio includes Burj Khalifa and Dubai Mall. For investors, this scale and delivery history provide a meaningful measure of confidence at the off-plan stage.
LOCATION: DUBAI CREEK HARBOUR, A MASTER-PLANNED WATERFRONT DISTRICT
Dubai Creek Harbour is an Emaar master-planned waterfront district along Dubai Creek, near the Ras Al Khor Wildlife Sanctuary, with a marina and central park and good connectivity to Downtown Dubai. Per the brochure, Arlo sits in a district near Creek Beach, with a waterfront promenade, adventure playground, cycling track and skate park nearby, and connections to the RTA ferry terminal and metro station for onward travel to the wider city. Downtown Dubai and Dubai International Airport are each around 10 minutes away.
APPLICABLE STRATEGIES
- Pre-handover resale — the construction-linked plan means a buyer commits limited capital ahead of the 2028 completion; Dubai Creek Harbour has an active off-plan resale market, giving a potential exit route before handover. Actual premiums depend on market conditions at the time and should be checked against live DLD data.
- Buy-and-hold for rental — a waterfront-district apartment or townhouse near the Creek Beach promenade supports long-let demand; yields to be confirmed against current rental evidence.
- Owner-occupation — a primary or second home in an amenity-led waterfront community, including townhouses with private rooftop terraces.
RISKS & WATCHPOINTS
- Off-plan completion risk — delivery is scheduled for Q4 2028; timelines can move, and returns depend on the market at handover, not today's.
- Entry pricing — pricing should be weighed against comparable Creek Beach stock and verified on current PSF from live DLD data.
- Service charges — waterfront and amenity-rich communities typically carry higher service charges, which affect net yield.
- Supply — Dubai Creek Harbour has a substantial delivery pipeline; concurrent handovers can affect near-term resale and rental pricing.
- Pricing not first-party — Emaar publishes floor-plan areas for Arlo but has not published a price list, unit count or dated instalment schedule in the pack held; the prices, the approximate 431-unit count and the 10/80/10 structure shown are PropSearch-derived and should be verified before committing.
SOURCES
- Emaar — Arlo at Dubai Creek Harbour floor plans,
ARLO_DCH_FLOOR_PLANS.pdf(suite and total areas for all four unit types). - Emaar — Arlo at Dubai Creek Harbour brochure,
ARLO_DCH_BROCHURE.pdf(unit types, location, amenities). - Emaar Properties — 2025 revenue and delivery figures.
- PropSearch (propsearch.ae/dubai/arlo-tower) — starting prices, approximate unit count, payment structure and Q4 2028 handover only; Emaar publishes none of these in the pack held.
- Dubai Land Department transaction data (Dubai Creek Harbour) — live feed pending.


