Viera Residences in Dubai Production City
Viera Residences is a single residential building of apartments in Dubai Production City, Dubai, developed by Vantage Ventures. The unit types are one-bedroom and two-bedroom apartments. The Dubai Land Department register, read 7 November 2026, records it as one building with 144 units.
The building and units
The register describes the building as ground floor, one podium level, eight upper floors and a roof level (G+1P+8+R), with a concrete and block structure and internal and external finishes.
The amenities named for the project are a swimming pool, a gymnasium, a sauna and a children's play area. They also include a rooftop terrace, a lounge for residents, a lounge in the lobby, a hall for multiple uses and two landscaped outdoor lounges.
Location
Dubai Production City was known as IMPZ, short for International Media Production Zone, before it was renamed. Established in 2003 beside Sports City, it is a mixed-use community of 43 million square feet with commercial as well as residential buildings, and roughly 40% of the land available has been built on. The community has 10 sub-communities, among them Midtown by Deyaar, City Centre Me'aisem and Mesk District.
Its western side holds about 20 warehouse and office buildings, some still being built, and its eastern half has 17 residential buildings, all of them high-rise apartment blocks. The Ghaya Grand Hotel, a five-star hotel, opened in 2017.
By road, the community sits where Sheikh Mohammed Bin Zayed Road (E11) meets Al Khail Road.
Fixed places around Viera Residences, with their straight-line distances from the building:
- Jumeirah Golf Estates Golf Course, 1.3 km
- JVT District 4 Park, 1.5 km
- Sunmarke School, 1.8 km
- Arcadia British School, 1.9 km
Neighbouring communities include Jumeirah Village Triangle, Jumeirah Golf Estates, Sports City and Jumeirah Village Circle.
DLD register status
The Dubai Land Department register, read 7 November 2026, lists the project as project number 3294 with the status Completed. It shows the works as 100% complete as at 29 January 2026, and gives a projected completion date of 31 December 2025. The escrow agent named on the register is Commercial Bank International P.J.S.C.