Trinity By Karma in Arjan
Trinity By Karma is an apartment building in Arjan, Dubai, developed by Karma Realty Developers L.L.C. It is registered with the Dubai Land Department as project 2933. The register describes a structure of concrete and block, with internal and external finishes.
The building and units
The register gives the height as G+P+15: a ground floor, a podium level and 15 floors above. The project is listed as apartments, and two-bedroom units are the type named for it. The register counts 309 units in the single building.
Location
Arjan sits within the Al Barsha South area of Dubai. It is a freehold area with mixed uses, at the point where Sheikh Mohammed Bin Zayed Road (E311) meets Umm Suqeim Road (D63), with Dubai Motor City to its south.
Arjan was launched in 2006 as one piece of the wider DubaiLand scheme, which was meant to hold a large group of theme parks. Work paused around 2010, after the global financial crash, and has since resumed. Dubai Miracle Garden opened in Arjan in 2013, and Butterfly Park followed in 2015. A count made in September 2020 found 48 completed buildings and 37 more under development, with the road network close to fully built.
The current masterplan divides Arjan into 10 development zones holding 157 plots. It allows for hotel, retail and office space, and for enough apartments for 67,000 residents.
Several fixed places lie within a short distance of Arjan. Measured from the community, Dubai Miracle Garden is 0.7 km away, and Arjan Community Park, Arjan Family Park and Diamond Park Arjan are each 0.3 km away. Dhruv Global School is 0.2 km away and Australian International School Dubai is 0.6 km away. Arabian Ranches Golf Club is 3.3 km away and Roxy Cinemas at Circle Mall is 2.2 km away.
Dubai Land Department register status
The Dubai Land Department register, read 7 November 2026, shows Trinity By Karma as active, with the status label "Under construction". It records the project as 30.87% complete as at 30 September 2026. The start date is 1 July 2024, and the projected completion date is 1 December 2026. That date is the register's projection and not a delivery commitment.
The register names First Abu Dhabi Bank P.J.S.C. as the escrow agent for the project. We can check the escrow details for you before any commitment.