The Waterway by Prestige One in Bukadra
The Waterway is a residential tower in Bukadra, Dubai. It is a single building of apartments, and it is under construction. The Dubai Land Department register carries it as project 3198 under the name "The Waterway by Prestige One".
The building and units
The register records the project as designed with a concrete structure and block, with internal and external finishes. Its height notation reads G+3P+16+Mechanical+Roof, which is how the Dubai Land Department writes the building's levels.
The unit types named for The Waterway are one-bedroom and two-bedroom apartments, each with a private pool.
Amenities named for the project are:
- double-height entrance lobby
- gymnasium
- infinity pool and lagoon pool
- private pools
- climbing wall
- kids' play area
- lounge area
- observation deck
- outdoor cinema
- smart home technologies
- valet parking
These are specified for the project. Check each one against the final plans and the sale documents before relying on it, as the building is not yet finished.
Location
The Waterway sits in Bukadra, within Meydan Horizon, which belongs to the Meydan area of Mohammed Bin Rashid City. The city district covers a 10,800 hectare site south of Business Bay.
Nearby fixed places, with the distances given for each:
- Sobha Hartland, 2.0 km: a mixed-use development of eight million square feet with villas, townhouses, duplexes and apartments.
- North London Collegiate School Dubai, 2.2 km, and Hartland International School, 2.5 km, both inside Sobha Hartland.
- Azizi Riviera, 2.3 km: two hotels and 69 mid-rise residential buildings set along a crystal lagoon.
- The Track, Meydan Golf, 2.7 km.
- Meydan, 3.4 km: a development of 40 million square feet, still under way, that includes the Meydan Race Course.
- Dubai Festival City, 5.1 km: a 1,300-acre community of residential, commercial and leisure uses on the east side of Dubai Creek.
DLD register status
The Dubai Land Department register, read 7 November 2026, shows The Waterway as active and under construction. Works were recorded as 14.73% complete as at 17 August 2026. The register gives a start date of 15 November 2024 and a projected completion of 30 June 2027. That is the Dubai Land Department's date, a projection and not a promise of handover.
Progress percentages change as inspections are filed, so ask for the latest figure before you commit.