The Corner by Arabian Gulf Properties in Wadi Al Safa 5
The Corner is a mid-rise residential building in Wadi Al Safa 5, Dubai, within the Dubai Land Residence Complex. The building is under construction.

Arabian Gulf Properties · Wadi Al Safa 5
Dubai Land Residence Complex · Dubai
The Corner in Wadi Al Safa 5, Dubai: a 126-unit, eight-storey apartment building by Arabian Gulf Properties with studios, 1 and 2 bedrooms, under construction.
At a glance
The brief
The Corner is a mid-rise residential building in Wadi Al Safa 5, Dubai, within the Dubai Land Residence Complex. The building is under construction.
All figures are from the Dubai Land Department register, read 7 November 2026.
The Corner is an eight-storey apartment building. The unit types are studios, 1-bedroom apartments and 2-bedroom apartments.
The project's listed amenities are a gym and a swimming pool on the roof. Neither is built yet, so both should be read as specified amenities and confirmed against the final design before any decision.
The Corner sits in the Dubai Land Residence Complex, known as DLRC, part of Dubailand. The complex holds 217 building developments and has three sub-communities: DRC Drive Thru Strip, Mark & Save Mall and Turtle Avenue. Most roads and pavements in the complex are finished, and the roundabouts and main junctions have been planted with greenery.
Mid-sized community parks have been laid out in both halves of the complex, and two smaller parks on its outer edge include sports and play facilities. From The Corner, DRC South Park and DRC East Park are each 0.2 km away, and DRC South Community Hub is 0.5 km away.
Everyday outlets are close. The complex has 140 open outlets, among them 35 restaurants, six supermarkets, five pharmacies, 12 mini marts and three children's nurseries. Mark & Save Mall is 0.4 km from the building, as are Pluto Building and Kay 7, and Raja Shopping Centre is 0.5 km away.
The closest school to the building is The Aquila School, 0.6 km away. Lycee Francais International Georges Pompidou and GEMS FirstPoint School are each 1.2 km away, and GEMS Wellington Academy, Dubai Silicon Oasis is 2.2 km away.
Further out, IMG Worlds of Adventure is 7.0 km from the building and Global Village is 8.5 km. The nearest neighbouring communities are The Villa at 3.0 km, Liwan at 3.3 km, Dubai Silicon Oasis at 4.1 km and Falconcity of Wonders at 5.1 km. Distances are given in kilometres and are not journey times.
The Dubai Land Department register, read 7 November 2026, shows project 2904, THE CORNER, with status ACTIVE and the label "Under construction". It records a start date of 1 September 2024 and a completion level of 37.69% as at 1 June 2026. The register's projected completion date is 30 June 2027. Projected dates can move, so the register should be checked again nearer any commitment.
The register names Mashreq Bank PSC as the escrow agent for the project.
In depth
The developer on the Dubai Land Department register is Arabian Gulf Properties.
If you are considering The Corner for a purchase, Mitchell's Commercial Real Estate can check the current register entry, review the contract terms with you and compare the building against other options in the Dubai Land Residence Complex. Contact us to discuss the project. Our buying costs calculator sets out the fees on a purchase.
The Corner is in Dubai Land Residence Complex, within the Wadi Al Safa 5 area.
Area and community are from our own project record.
Area and community: our own project record. Neither is a survey.
The Corner — Dubai Land Residence Complex, Wadi Al Safa 5
Arabian Gulf Properties is the developer named on this brief.
The Corner is in Wadi Al Safa 5, Dubai, in the Dubai Land Residence Complex, which is also known as DLRC. The Dubai Land Department register, read 7 November 2026, lists the project under the area Wadi Al Safa 5.
The Dubai Land Department register, read 7 November 2026, records 126 units in one building, with no villas.
The Corner is an apartment building. The unit types are studios, 1-bedroom apartments and 2-bedroom apartments.
The Dubai Land Department register, read 7 November 2026, gives a projected completion date of 30 June 2027. It shows the project as under construction and 37.69% complete as at 1 June 2026.
The listed amenities are a gym and a swimming pool on the roof. Both are specified rather than built, as the project is under construction.
Next step
Tell us what you are looking for and we’ll come back with what is actually available, at what price, and the payment terms attaching to it.