Serenia District East Residences in Jumeirah Islands
Serenia District East Residences, a multi-building residential project, stands within the Serenia District part of Jumeirah Islands, Dubai. Tower names given for the project include Serenia District East Tower 2, Tower 3, Tower 4, Tower 5 and Tower 6.
The building and units
The register describes the project as residential with retail. Its description lists a basement, a ground floor, three podium levels and a first floor that includes entertainment space, with residential floors above and a roof and upper roof.
Apartments are listed for the project in 1, 2, 3 and 4-bedroom types, with a further category marked as other.
Location
Jumeirah Islands is a gated community of 736 villas, set in clusters of 16 on 46 small islands among lakes and water features. Every villa comes with a private pool and garden. The community also has 31 mansions set apart in their own enclave and a development of 84 four-bedroom townhouses, begun in 2014 and delivered in 2017. Nakheel began construction on the community in March 2007 and finished it in January 2012.
Within the community there is a clubhouse with a gymnasium, a lagoon pool and a licensed restaurant, plus three tennis courts. Jumeirah Islands Pavilion, a shopping centre that opened in April 2017, holds 14 outlets across shops, restaurants and cafés, and a jogging track of 1.1 km follows the water alongside it.
Jumeirah Islands is set back from the coast behind Jumeirah Lakes Towers and Dubai Marina, on the east side of Sheikh Zayed Road (E11), along the stretch between its interchanges 5 and 6. Dubai Metro trains run beside the highway; the closest stations are Jumeirah Lakes Towers and Nakheel Harbour.
Measured from the project, these fixed places are nearby:
- JLT Park, 0.8 km
- The Walk JBR, 1.7 km
- Marina Walk, 1.9 km
- Emirates Golf Club, 2.6 km
- Montgomerie Golf Course, 3.0 km
- Reel Cinemas at Dubai Marina Mall, 1.1 km
- Emirates International School Meadows, 1.0 km
- Dubai British School Emirates Hills, 2.7 km
DLD register status
The Dubai Land Department register, read 7 November 2026, shows the project as active and under construction. The start date it records is 2 January 2026. As at 23 June 2026 it showed the project 1.12 per cent complete. Completion is projected for 30 June 2030, which is the register's projected date and can move.