Saddlewood Park by Mak Developers L.L.C in Nad Al Shiba First
Saddlewood Park is a residential project in the Meydan Avenue part of Nad Al Shiba First, within the Meydan Racecourse Community, Dubai. It is listed at five storeys, a ground floor and four residential floors with a rooftop, and the Dubai Land Department register, read 7 November 2026, records it as a single building.
The architectural theme listed for the project is equestrian, borrowing from royal stables and the arenas of championship riding.
The building and units
The unit types listed for the project are one-bedroom apartments, two-bedroom apartments and penthouses. The building is listed as mid-rise.
Interiors. The finishes listed for the project are brushed gold, veined stone, warm woods and soft fabrics. Floors are tiled, walls carry wood and stone accents, and the cabinetry and lighting are made to order. Kitchens are listed with built-in storage, a breakfast island and integrated appliances. Bathroom fittings listed include double sinks, walk-in showers, backlit vanity mirrors and free-standing baths.
Smart systems. The project lists building systems that recognise residents and adjust the environment to who is present, along with lighting that follows circadian and mood settings. Personalised, computer-driven gym equipment and a live weather display are also listed.
Amenities. The project's listed amenities are a rooftop infinity pool, padel tennis court, gym, clubhouse, co-working space, outdoor cinema, jacuzzi, steam and sauna rooms, yoga deck, pilates facilities, zen garden, sundeck, seating deck and landscaped gardens.
Location
Nad Al Shiba First lies inside Mohammed Bin Rashid City. Meydan, the wider development, spans 40 million square feet. Its racecourse opened in 2010. The Meydan Avenue part of the development takes in The Meydan Hotel as well as the racecourse and its grandstand.
Measured from the building, The Meydan Hotel is 1.1 km away and The Track Meydan Golf is 0.8 km away. Riviera South Park is 0.9 km away.
Azizi Riviera, 0.9 km away, is set around a crystal lagoon and counts 69 residential buildings, all mid-rise, and two hotels. The Polo Residence, 1.8 km away, is a gated community of 29 five-storey apartment blocks, with shops, a spa, a swimming pool and sports courts.
Hartland International School and Bilingual French International School are each 1.5 km from the building. Rashid and Latifa Schools are 1.7 km away.
Business Bay is 4.4 km away and Downtown Dubai 4.7 km. Mohammed Bin Rashid City covers a 10,800 hectare site south of Business Bay.
DLD register status
The Dubai Land Department register, read 7 November 2026, lists Saddlewood Park as project number 3889, status active, under construction. It shows the project 12.45% complete as at 24 August 2026, with a start date of 1 December 2025 and a projected completion of 30 September 2027. The register names Sharjah Islamic Bank as escrow agent.