Palatium Residences, Jumeirah Village Circle
Rising 17 storeys, Palatium Residences is a single apartment building in JVC District 14, within Jumeirah Village Circle, Dubai. The Dubai Land Department register, read 7 November 2026, holds it as project number 3065.
The building and units
Unit types run from studios to apartments with up to three bedrooms. Ask us which floors and layouts are open to you.
Location
Jumeirah Village Circle, usually shortened to JVC, is a freehold master community that Nakheel launched in 2005 beside Sheikh Zayed Road. Apartment buildings sit alongside villas and townhouses, and building work continues in parts of the community.
Road access runs through the junction of Sheikh Zayed Road and Al Khail Road. Since 12 October 2016, entry and exit points built by Nakheel have linked the community with Hessa Street. The nearest metro station is at Mall of the Emirates, and feeder bus J01 runs between the community and the mall.
Distances from the building to nearby places:
- Parks: 2nd of December Park is 0.2 km away, and Shooa Park and Yas Park are each 0.3 km away.
- Hotel: Five Jumeirah Village Dubai is 0.1 km away.
- Cinema: Roxy Cinemas in Circle Mall is 1.7 km away.
- Schools: Sunmarke School is 1.4 km away and JSS International School is 1.5 km away.
- Golf: The Els Golf Club is 1.9 km away and the Montgomerie Golf Course is 3.4 km away.
- Attraction: Dubai Miracle Garden is 3.9 km away.
Neighbouring districts include Jumeirah Village Triangle at 2.0 km, a mainly villa and townhouse area with apartment buildings around its rim; The Springs at 2.6 km, a gated villa community; Dubai Production City at 2.7 km, a free zone for print and media businesses; and Motor City at 3.2 km, where housing and a business park surround a motor-racing circuit.
DLD register status
The Dubai Land Department register, read 7 November 2026, lists project 3065 as active and under construction. It records a start date of 31 May 2024 and shows the project 87.87% complete as at 30 September 2026. The register's projected completion date is 31 March 2026.
Registration is the first thing we check for a buyer, and we repeat the check before any reservation.