Muraba Veil by Muraba Properties in Al Wasl
Muraba Veil is a single tower by Muraba Properties in Al Wasl, Dubai, standing beside the Dubai Water Canal. The Dubai Land Department register classes it as a residential and commercial building. The tower rises 380 metres (1,247 feet) on a footprint 22.5 metres wide, which holds one apartment from side to side.
The building and units
The register describes the building as six basement levels, a ground floor, 72 floors and one roof level. The unit types listed for the project are apartments and duplexes, in two-, three- and four-bedroom layouts.
Amenities listed for the project include a wellness spa, a restaurant and a private cinema. The design features listed are outdoor spaces and screens drawn from the Mashrabiya, shaped to let a breeze pass through the building, and a facade of stainless-steel mesh.
Location
Al Wasl is bounded to the east by Sheikh Zayed Road, with Satwa on one side and Al Safa on the other. The area holds 216 buildings, 622 villas, 8,705 residential units and 736 commercial units.
Nearby places, with their distances from the tower:
- V Hotel Dubai and Hilton Dubai Al Habtoor City, each 0.3 km away
- Dubai Centre for Special Needs, 0.3 km, and Dubai British School Jumeira, 0.5 km
- Business Bay West Park, 0.8 km, and Safa Park, 0.9 km
- Bay Avenue Mall & Park, 1.4 km, and Boxpark, 1.5 km
Boxpark, a strip of shops, cafes and restaurants housed in recycled shipping containers, lines Wasl Road on its eastern side, a short way north of Safa Park. Galleria Mall is a one-level mall beside Emirates Post Office, on the eastern side of Wasl Road. City Walk takes up the northern part of Al Wasl, and its first phase, made up of shops and restaurants, is open. Schools in the area include JSS Private School, Al Rays Girls School, Horizon School, Al Safa High School and Al Maktoum Boys School.
DLD register status
The Dubai Land Department register, read 7 November 2026, lists project 3106 as active and under construction. It records the project as 7.6% complete as at 28 September 2026, with a start date of 1 December 2024 and projected completion on 31 December 2028. The escrow agent named on the register is Commercial Bank Of Dubai(Psc).