Lateral One by Grand Signature in Wadi Al Safa 5
Lateral One is a mixed residential and retail building in the Dubai Land Residence Complex, known as DLRC, in Dubailand. It is a development of Grand Signature, and the units are studios, one-bedroom apartments and two-bedroom apartments. The project information also describes two retail units in the building.
The building and units
The register describes the building as ground floor plus three floors plus a roof level, combining commercial-retail use with residential apartments.
The published project information describes the building as ready for smart technology, with lighting designed to save energy and fixtures designed to save water. Kitchen fit-out includes countertops and appliances, and bedrooms are finished in neutral tones: beige, brown and cream.
The shared amenities named for the project are:
- a swimming pool
- a garden, cabanas and sunken seating
- a barbecue area
- a children's play area
- an outdoor gym with a fitness station
- yoga and meditation areas
- fibre optic connections
- shops
We can check the final specification with you as the project nears completion.
Location
Three community open spaces are close by: DRC Mixed Use West Park is 0.2 km away, DLRC North Park is 0.3 km away and DRC Central Community Hub is 0.7 km away.
Among nearby schools, Lycee Francais International Georges Pompidou is 0.9 km away, GEMS FirstPoint School is 1.0 km away and The Aquila School is 1.2 km away. IMG Worlds of Adventure is 6.0 km away and Global Village is 7.7 km away.
Several neighbourhoods lie close by. Liwan, a freehold community within Dubailand, is 1.6 km away, and The Villa, made up of courtyard villas in a Spanish style, is 2.1 km away. Dubai Silicon Oasis, a free zone built around a technology park that also includes apartments, townhouses and villas, is 2.9 km away, and Falconcity of Wonders is 3.7 km away.
DLD register status
The Dubai Land Department register, read 7 November 2026, lists Lateral One with the status ACTIVE, labelled under construction. It shows the project 78.88% complete as at 28 October 2026. The register gives a start date of 1 January 2025 and a projected completion date of 31 December 2026.
Projected completion is the register's date, not a handover commitment, and the percentage complete changes as the register is updated.