Guzel Towers, Jumeirah Village Triangle
Guzel Towers, by Tiger Properties, is a mixed residential and office development in Jumeirah Village Triangle, Dubai. It is made up of two towers, Block A and Block B, and is under construction.

Tiger Properties · Al Barsha South Fifth
Jumeirah Village Triangle · Dubai
Guzel Towers by Tiger Properties, Jumeirah Village Triangle: two buildings and 522 units under construction, with studio, 1-bedroom and 2-bedroom apartments.
At a glance
The brief
Guzel Towers, by Tiger Properties, is a mixed residential and office development in Jumeirah Village Triangle, Dubai. It is made up of two towers, Block A and Block B, and is under construction.
Every row is from the Dubai Land Department register, read 7 November 2026. The completion date is the register's projection.
The register describes the scheme as two basement levels, a ground floor and four podium levels, with two towers rising above. Block A has 25 residential floors plus a technical floor and a roof. Block B has 20 residential floors, 5 office floors and a technical floor, plus a roof.
The same description places retail on the ground floor and a swimming pool with an entertainment area on the first floor.
The apartment types are studios, 1-bedroom and 2-bedroom apartments. Shared facilities set out for the scheme, which are still to be built, are a gym, a spa, a hot tub, a jogging track, a children's play area, a barbecue area, sunken seating and sun loungers.
Finishes named for the interiors are crema marble floors, walls in wood veneer and glass with a brown tint. In kitchens and bathrooms the materials named are travertine marble, laminated wood and bronze mixers.
Jumeirah Village Triangle lies beside Sheikh Zayed Road, near where it meets Al Khail Road. Its housing is largely villas and townhouses, each set in a sizeable garden, with apartment blocks rising at the edges of the district. Jumeirah Village Circle lies next to it.
JVT District 1 Park is 0.2 km from the towers. Arcadia British School is 1.8 km away and Dubai British School Jumeirah Park is 1.9 km away. Of the golf courses, Jumeirah Golf Estates Golf Course is 3.0 km away, Montgomerie Golf Course is 3.9 km away and The Els Golf Club is 4.1 km away. Reel Cinemas at The Springs Souk is 4.2 km away.
Among neighbouring communities, Midtown by Deyaar lies 0.9 km away and Dubai Production City lies 1.8 km away; The Springs is at 3.0 km, Jumeirah Park at 3.1 km, Al Furjan at 3.4 km and Jumeirah Islands at 3.6 km.
The Dubai Land Department register, read 7 November 2026, lists Guzel Towers as project 3458, status active and under construction. It records a start date of 1 December 2024, progress of 7.3% as at 7 October 2026 and a projected completion date of 25 December 2027. The escrow agent shown is Emirates NBD Bank (P.J.S.C).
Construction is still at an early stage, so the projected date can move and is worth checking again before any decision.
In depth
Tiger Properties is the developer named in the register.
Mitchell's Commercial Real Estate acts for buyers. If you are weighing Guzel Towers, we can check the current register entry for you, set out the unit types and talk through the points to confirm before committing. Contact us and we will go through it with you. Our buying costs calculator sets out the fees on a purchase.
Guzel Towers is in Jumeirah Village Triangle, within the Al Barsha South Fifth area.
Area and community are from our own project record.
Area and community: our own project record. Neither is a survey.
Guzel Towers — Jumeirah Village Triangle, Al Barsha South Fifth
Tiger Properties is the developer named on this brief.
Guzel Towers is in Jumeirah Village Triangle, Dubai. The Dubai Land Department register, read 7 November 2026, places it in the area of Al Barsha South Fifth.
The Dubai Land Department register, read 7 November 2026, records two buildings with 522 units and no villas. The unit types are studios, 1-bedroom and 2-bedroom apartments.
The Dubai Land Department register, read 7 November 2026, gives a projected completion date of 25 December 2027. The register shows the project as active and under construction, 7.3% complete as at 7 October 2026.
The Dubai Land Department register, read 7 November 2026, names Tiger Properties as the developer of project 3458.
Next step
Tell us what you are looking for and we’ll come back with what is actually available, at what price, and the payment terms attaching to it.