A 29-storey tower in JVT District 3
FH Residency is a single residential tower in District 3 of Jumeirah Village Triangle (JVT), Dubai. The building is 29 storeys tall over one basement level, and it holds studios plus apartments of one, two or three bedrooms.
The building and units
The single basement level is used for car parking.
Parking is allocated by size. A studio, one-bedroom or two-bedroom apartment carries one space, while a three-bedroom apartment carries two.
The shared facilities named for the building are a fitness centre and a separate fully equipped gym, a yoga studio, swimming pools, a coffee shop, a co-working area, an indoor playroom, outdoor children's play areas and outdoor exercise equipment. The co-working area sits on the 24th floor and faces towards the Dubai Marina skyline. Corridors are finished in a plain, neutral palette.
Location
Nakheel developed JVT as a master community. Most of its original housing is small villas and townhouses of one or two bedrooms set in large gardens, with apartment towers built around the edges of the triangle. The community is split into 11 sub-communities and holds 124 building developments.
From the tower it is 0.1 km to the District 3 park and 0.4 km to JVT District 2 Park. It is 0.6 km to Arcadia British School and 1.3 km to Sunmarke School, and 0.3 km to a Four Points by Sheraton hotel.
Just beyond the community, Dubai Production City, a free zone for media, print, publishing and packaging businesses, starts 1.0 km away, and the gated villa streets of The Springs are 2.0 km away. Golf is close: it is 2.7 km to the Jumeirah Golf Estates course, 3.0 km to The Els Golf Club and 3.1 km to the Montgomerie course. For films, it is 3.0 km to the Reel cinema at The Springs Souk and 4.3 km to the Roxy cinema in Circle Mall. Marina Walk lies 6.2 km away, with 6.5 km to Dubai Miracle Garden.
DLD register status
The Dubai Land Department register, read 14 November 2026, gives the project's status as finished, with the label completed. It shows the project 100% complete as at 3 July 2026, and its completion date for the project is 30 January 2026.