Palm Jumeirah AED 3,549/sqftDubai Maritime City AED 3,136/sqftDowntown Dubai AED 2,873/sqftDubai Islands AED 2,756/sqftDubai Creek Harbour AED 2,558/sqftBusiness Bay AED 2,494/sqftDubai Marina AED 2,468/sqftDubai Hills Estate AED 2,464/sqftJumeirah Lakes Towers AED 2,321/sqftMohammed Bin Rashid City AED 2,098/sqftAl Jaddaf AED 2,049/sqftJumeirah Village Triangle AED 1,657/sqftDubai South AED 1,653/sqftArjan AED 1,584/sqftJumeirah Village Circle AED 1,488/sqftDubai Sports City AED 1,324/sqftALL DLD SALES · OFF-PLAN + EXISTINGPalm Jumeirah AED 3,549/sqftDubai Maritime City AED 3,136/sqftDowntown Dubai AED 2,873/sqftDubai Islands AED 2,756/sqftDubai Creek Harbour AED 2,558/sqftBusiness Bay AED 2,494/sqftDubai Marina AED 2,468/sqftDubai Hills Estate AED 2,464/sqftJumeirah Lakes Towers AED 2,321/sqftMohammed Bin Rashid City AED 2,098/sqftAl Jaddaf AED 2,049/sqftJumeirah Village Triangle AED 1,657/sqftDubai South AED 1,653/sqftArjan AED 1,584/sqftJumeirah Village Circle AED 1,488/sqftDubai Sports City AED 1,324/sqftALL DLD SALES · OFF-PLAN + EXISTING
DLD · MEDIAN 12M TO NOV 2026
Exterior facade of Eywa Way of Water — Business Bay, tower — Mitchell's Commercial Real EstateOFF-PLAN

Revolution Palm Real Estate L.L.C

Eywa Way of Water

Business Bay · Dubai

Eywa The Way Of Water in Business Bay by Revolution Palm Real Estate: 65 units, 2 to 5 bedrooms, under construction, DLD projected completion 15 October 2028.

Unit typesApartments
Book a private briefing

At a glance

Project summary

4 lines
Developer
Revolution Palm Real Estate L.L.C
Community
Business Bay, Dubai
Status
Off-plan
Unit mix
Apartments

The brief

About this project

Eywa Way of Water, Business Bay

Eywa Way of Water, a residential tower in Business Bay, Dubai, has frontage onto the Dubai Water Canal. It is registered with the Dubai Land Department as Eywa The Way Of Water, project 3890. The architecture is modelled on a mangrove tree, with coral motifs, ceramic roots and plant-inspired forms, and its structure and detailing refer to sea urchins, turtles and stingrays.

Project (register name)
Eywa The Way Of Water
DLD project number
3890
Area and community
Business Bay
Buildings
1
Units
65
Villas
0
Register description
G+27+R - Residential and Amenities

All rows are from the Dubai Land Department register, read 7 November 2026.

The building and units

The tower has 28 storeys above a single basement level used for parking. The building holds apartments of two and three bedrooms, together with three duplexes and a single penthouse.

Sizes by type:

  • Two-bedroom apartments: 2,154 to 2,993 sq ft
  • Three-bedroom apartments: 4,663 to 4,996 sq ft
  • Duplexes: 5,643 sq ft to 9,990 sq ft
  • Penthouse: approximately 22,900 sq ft

Each unit has its own lobby with direct lift access. Private terraces carry their own pools, waterfalls and planting. Ceiling heights are between 3.2 and 3.8 metres in single-level units and between 3.2 and 7.6 metres in the duplexes and the penthouse.

Inside, living and common areas are laid with travertine and bedrooms with wooden parquet, and a shoes-off rule applies on every floor. Kitchen cabinetry is Australian Paldao timber. Bathrooms use stone slabs with a textured, leather-like finish. Materials are specified as non-toxic and mould- and fungus-resistant, and paints carry third-party sustainability certification. Bedrooms are fitted with grounded sockets and EMF shielding, and every unit has a smart automation system.

The design follows neuroarchitecture and biophilic principles. The site and the position of some internal elements were chosen with reference to Vastu Shastra and energy studies. Crystals weighing more than 21,000 kilograms in total, semi-precious stones among them, are set into the structure in a pyramid form and placed in shared rooms. The water systems use sound vibration harmonisation.

Amenities

The amenity floors hold six pools in all, among them an indoor pool, an infinity pool and several plunge pools. The wellness area has cryo, infrared, herbal and salt saunas, plus a hammam, an ice bath, a cold plunge and a Japanese bath. Other features are a meditation labyrinth, a crystal garden, a turtle nest, a floating fireplace and a hammock themed on the stingray.

Location

Business Bay lies along the Dubai Water Canal, a 100-metre-wide waterway that connects the district with the sea; water-bus and private-boat stations line each bank. The district covers 64 million sq ft of freehold projects, has access to both Al Khail Road and Sheikh Zayed Road, and includes Business Bay Metro station.

Distances from the building:

  • Parks: Business Bay South Park at 0.6 km, Business Bay East Park at 0.7 km and Action Park Business Bay at 0.8 km
  • Bay Avenue Mall & Park at 1.1 km
  • the Fountains at Dubai Mall at 1.4 km
  • Kidzania at 1.5 km
  • Downtown Dubai, where Burj Khalifa, Dubai Opera, Dubai Mall and the Dubai Fountain stand, at 1.5 km
  • Towheed Iranian Boys School, Al Quoz, at 1.8 km
  • The Track Meydan Golf at 4.5 km

In depth

In depth

Detail, in the order it was written

DLD register status

The Dubai Land Department register, read 7 November 2026, shows the project as active and under construction. Construction start is 15 February 2026. Completion is projected for 15 October 2028. The register recorded 0 per cent complete as at 23 October 2025. Its named escrow agent is Al Maryah Community Bank L.L.C - Dubai Branch.

Developer

The Dubai Land Department register, read 7 November 2026, names the developer as Revolution Palm Real Estate L.L.C.

Enquiries

Mitchell's Commercial Real Estate acts for buyers in Dubai. If you would like to review the register entry for project 3890, compare the unit types above, or discuss how this project fits a brief you hold, contact us and we will go through it with you. Our buying costs calculator sets out the fees on a purchase.

Location

Area and connectivity

Eywa Way of Water is in the Business Bay area.

Location record
Area
Business Bay

Area and community are from our own project record.

Area and community: our own project record. Neither is a survey.

Location

Eywa Way of Water — Business Bay

Get Directions

Book a private briefing

Book Now
The developer

Revolution Palm Real Estate L.L.C

Revolution Palm Real Estate L.L.C is the developer named on this brief.

Got questions?

Get Answers!
Questions

Common questions

Where is Eywa Way of Water?

The building is in Business Bay, Dubai, with frontage onto the Dubai Water Canal.

How many units does the Dubai Land Department register show?

The Dubai Land Department register, read 7 November 2026, shows project 3890, Eywa The Way Of Water, with one building and 65 units, described as G+27+R, residential and amenities.

When is completion projected?

The Dubai Land Department register, read 7 November 2026, gives a projected completion date of 15 October 2028. The project is shown as under construction.

What unit types are in the building?

Apartments of two and three bedrooms, three duplexes and a single penthouse. Two-bedroom apartments run from 2,154 to 2,993 sq ft and three-bedroom apartments from 4,663 to 4,996 sq ft.

Who is the developer?

The Dubai Land Department register, read 7 November 2026, names the developer as Revolution Palm Real Estate L.L.C.

Next step

Enquire about this project

Tell us what you are looking for and we’ll come back with what is actually available, at what price, and the payment terms attaching to it.

Book a private briefing
Need help?