Bond Living by Pearlshire Developments
Bond Living is a residential building by Pearlshire Developments in Dubai Residence Complex, Dubai. The Dubai Land Department register records a single building with 94 units. It offers studios and apartments of 1 to 3 bedrooms.
Location
Bond Living is in Dubai Residence Complex, Dubai. Dubai Residence Complex sits in Dubailand. The Dubai Land Department register lists the area as Wadi Al Safa 5.
The Dubai Land Department register entry for Bond Living lists it as project 4073.
Design and interiors
Pearlshire's project page, read 29 November 2026, gives the building as a basement, ground floor, 11 floors and a rooftop, which matches the DLD description above. It names the architect as Tony Ashai of Beverly Hills and the contractor as Globecon Construction. It says every residence has private outdoor space.
In its launch announcement, published by Khaleej Times on 2 February 2026, Pearlshire described a boutique mid-rise of 94 residences in a low-density building, with hospitality-led interiors, warm European finishes, smart-home readiness, spa-inspired bathrooms and integrated kitchens. The announcement says floor-to-ceiling glass openings lead from the living areas to private balconies.
Amenities as Pearlshire lists them
Pearlshire's project page lists an infinity pool, a jogging track, a children's play area, an outdoor cinema, a barbecue area, outdoor yoga, a gym, a residents' lounge, an arrival courtyard and electric-vehicle charging ports. The launch announcement places the infinity pool, an outdoor yoga and meditation deck, the jogging track, the outdoor cinema and social barbecue areas on the rooftop.
Sizes Pearlshire publishes
Pearlshire's floor-plan listing gives studios at 542 to 554 sq ft and two-bedroom apartments at 1,056 to 1,176 sq ft.
Payment plan
Pearlshire publishes a 40/60 plan. The 40 per cent during construction is paid as 5 per cent on booking, 15 per cent at one month, then 5 per cent at each of months 6, 11, 16 and 21. The remaining 60 per cent falls due on handover, which the page gives as 30 September 2028.