Beverly Boulevard by HMB Homes in Arjan
Beverly Boulevard, a mid-rise apartment building in Arjan, rises nine storeys above a single basement and is now finished. HMB Homes Real Estate Development built it, and it combines studios, one-bedroom and two-bedroom apartments with shops at ground level. This brief is for owners of a unit here, for buyers looking at one on the resale market, for sellers, and for anyone comparing the building with others in Arjan. It covers the building, the area around it and what the Dubai Land Department records on the project.
The building and its apartments
Federal Engineering Consultants acted as architectural consultant, and Golden Wing Contracting was the main contractor. The basement holds the car park.
A private pool was specified for some of the one-bedroom and two-bedroom units.
The shared facilities named for the project centre on a large communal pool laid out in a beach style, described as semi-Olympic in size, with a pool bar beside it. Around it the specification lists cabanas, a barbecue area, multi-purpose courts, an open-air gym, a steam room and a sauna, a jogging track, an amphitheatre and a children's play area. Charging points for electric vehicles are also listed.
At ground level the developer set aside nine retail spaces, with a promenade, a drop-off point and visitor parking specified in front of them.
Arjan
Arjan is a freehold community combining residential and commercial uses.
Beverly Boulevard is close to the community's parks. Measured from the building:
- 0.3 km to Arjan Community Park, Arjan Community Park North and Diamond Park Arjan
- 0.9 km to Dubai Miracle Garden
- 2.1 km to Circle Mall, which has a cinema
- 3.5 km to Arabian Ranches Golf Club and 3.8 km to The Els Golf Club
Day-to-day needs are close by: a medical centre and a pharmacy sit 0.1 km from the building, and supermarkets 0.2 km away. The nearest schools lie 0.5 km away (Dhruv Global School) and 0.7 km away (Australian International School Dubai).
DLD register status
The Dubai Land Department register, read 14 November 2026, holds the project as number 2504 under the name Beverly Boulevard, in the Arjan community and the Al Barsha South Third area. It shows a start date of 1 October 2022 and a completion date of 30 September 2024, and records the project as 100% complete as at 15 February 2025.
For anyone buying or selling here, the project number is the surest way to tie a title deed or a sale contract to this particular building.