Belle Vie by Zimaya in Silicon Oasis
Belle Vie is a residential building of apartments by Zimaya Properties in Silicon Oasis, in the Nadd Hessa area of Dubai. It is a mid-rise block of nine storeys with one basement level, and the Dubai Land Department register, read 7 November 2026, records it as a single building of 116 units.
The building and units
The basement is given over to parking. Residents' shared spaces are set on the podium.
The layouts listed for the project run from studios to apartments with one, two or three bedrooms. Some one- and two-bedroom layouts add a private study, and some units have a maid's room. Units come with private balconies and windows that run from floor to ceiling.
The amenities listed for the project are a swimming pool, a kids' pool, a kids' play area, pool cabanas, a fitness centre, a clubhouse, a party zone, barbecue facilities, sunken seating and seating areas.
Location
Silicon Oasis, also called DSO, is a free zone and technology park that falls under DIEZ, the authority for Dubai's integrated economic zones. It lies where the E311 crosses Al Ain Road (E66), next to Academic City. Its internal roads connect to Dubai-Al Ain Road through an extension of about 2.4 kilometres. Residents and companies share the district, and the population exceeded 90,000 in 2022.
Silicon Oasis Community Park lies 0.2 km from the building, Silicon Oasis Lake Park is 1.0 km away and Silicon North Park is 2.1 km away. The district's central lake is ringed by a running track. Souq Extra is the district's principal shopping centre, and a mini mart, a supermarket, pharmacies, an Aster Clinic and restaurants lie between 0.1 km and 0.3 km from the site.
Vernus International School Dubai is 1.3 km away, as is German International School Dubai; GEMS Wellington Academy is 1.4 km away and DESS College is 1.5 km away. The Radisson RED hotel in Silicon Oasis is 1.3 km away.
DLD register status
The Dubai Land Department register, read 7 November 2026, lists project 4023, BELLE VIE BY ZIMAYA, as active and under construction. It shows 11% of works complete as at 9 September 2026 and a projected completion of 31 March 2028. Mashreq Bank Psc is named as escrow agent.