Arib Collection in Wadi Al Safa 5
Arib Collection is a single mid-rise residential building in Wadi Al Safa 5, part of Dubai Land Residence Complex, which is also known as DLRC. The Dubai Land Department register describes it as a G+8+R residential building: a ground floor, eight floors above it and a roof level. It holds 49 apartments.
The building and units
The units are apartments, in three layouts: studios, one-bedroom and two-bedroom.
The apartments are specified with tiled flooring, marble finishes and feature walls lit by recessed strips. Kitchens are specified open plan, with built-in appliances, backlit cupboards and marble worktops. Each apartment is specified with a private balcony, with full-height windows and sliding doors that recess into the wall.
Planned amenities are a gym, a rooftop swimming pool, a pool deck, a lobby lounge, landscaped gardens and seating areas.
Location
Dubai Land Residence Complex is a large residential district within Dubailand, made up of 217 separate building developments, some complete and others still under development.
Day-to-day services are close by. A park, DLRC North Park, is 0.1 km from the building, and a mini mart and a restaurant sit in Phoenix Tower DubaiLand, also 0.1 km away. A large supermarket in Blue Wave Residence is 0.3 km away. Across the community as a whole there are 35 restaurants, six supermarkets and five pharmacies, among 140 outlets in operation.
Three schools are within 1 km: Lycee Francais International Georges Pompidou, which is 0.7 km away, GEMS FirstPoint School, which is 0.8 km away, and The Aquila School, which is 0.9 km away. GEMS Wellington Academy in Dubai Silicon Oasis is 1.5 km away.
Neighbouring communities include Liwan at 1.9 km, The Villa at 2.1 km, Dubai Silicon Oasis at 3.1 km and Falconcity of Wonders at 3.9 km. Further out, IMG Worlds of Adventure, which also houses a Novo Cinema, is 6.1 km from the building, and Global Village is 7.8 km away. A second Novo Cinema operates in Dragon Mall, which is 9.5 km away, and for golf, The Track Meydan Golf is 10.0 km away.
DLD register status
The Dubai Land Department register, read 7 November 2026, holds Arib Collection as project 3815 with an active status, labelled under construction. The register gives a start date of 1 October 2025 and a projected completion date of 1 December 2027. Its escrow agent for the project is Commercial Bank Of Dubai (Psc).
We matched the project to this row because its name, developer and community together match exactly one register row.