Dubai Land Department register
Badra Phase 1
450 homes on the DLD register in Hessyan First, filed by Dubai Waterfront (L.L.C). 475 sales have been registered against it between 19 Jan 2010 and 1 Oct 2026.
Completed
THE DLD RECORD
| Registered developer entity | Dubai Waterfront (L.L.C) |
| Area (DLD) | Hessyan First |
| Master community | Badra |
| Project status | Completed |
| Homes registered | 450 |
| Buildings | 8 |
| Registered start | 11 Nov 2012 |
| Registered completion date | 30 Jul 2014 |
| DLD project number | 1735 |
Source: Dubai Land Department project register. The developer, area, counts and filed dates are as recorded at 4 Oct 2026; the project status and escrow details as at 4 Oct 2026. Construction progress carries the date of the DLD site inspection that produced it, which is a different date again and is stated on the row — where the register holds no dated inspection, no percentage is published rather than an undated one. “Registered completion date” is the completion date on file at DLD; it is a date on record, not a guarantee of handover, and where that date has already passed it means only that the register has not been updated, not that the project handed over. Homes counted as registered apartments plus registered villas. Figures on this panel are the registry’s, and are stated as at different dates from the transaction figures elsewhere on the page. Registered completion: Jul 2014.
REGISTERED SALE PRICES
475 sales were registered against Badra Phase 1 between 19 Jan 2010 and 1 Oct 2026 — a span of 201 months. Those are completed registrations at the Dubai Land Department, not asking prices or listings.
The two figures behind that percentage are not drawn on the same population. This project’s median covers every registration type across the whole register we hold (28 Apr 2025 to 5 Oct 2026). The area figure covers all registration types in Hessyan First over the 12 months to 5 Oct 2026, pooled on the transaction register’s own area name, which does not always match the project register’s name shown above. Unit mix, floor level and view are not controlled for on either side, and neither is use class: DLD registers offices and shops as units, so registered retail and office sales are pooled into both figures, and retail trades at a materially higher rate per square foot than residential stock in the same building. In sectors where commercial space is a large share of what registers, the area figure sits well above the residential rate. Read it as an indication of where this project sits in its area, not as a like-for-like comparison.
A quarter with fewer than 20 registered sales is drawn hollow, with its sale count underneath. The change between quarters is quoted only between quarters that reached 20. Points are spaced evenly rather than by date.
| Type | Sales | Median size | Median AED/sqft |
|---|---|---|---|
| Studio | 3 | 512 sqft | 791 |
| 1 bedroom | 7 | 708 sqft | 799 |
| 2 bedrooms | 8 | 1,135 sqft | 707 |
| 3 bedrooms | 5 | 1,411 sqft | 779 |
Every band shows its median with its sale count. A band with fewer than 5 registered sales is shown in a lighter tone: read it as those sales, not as the rate for that unit type.
| Registration type | Sales | Median AED/sqft |
|---|---|---|
| Registered before completion | 0 | — |
| Registered after completion | 23 | 779 |
DLD splits registrations by timing: an off-plan registration is entered before the unit legally completes, an existing registration after. Where both appear, the gap between them reflects that difference as much as any movement in value. A side with fewer than 5 registered sales is shown in a lighter tone: read it as those sales, not as a rate.
| Building | Sales |
|---|---|
| MANARA 2 | 5 |
| MANARA 5 | 5 |
| MANARA 6 | 4 |
| MANARA 3 | 3 |
| MANARA 1 | 2 |
| MANARA 7 | 2 |
| MANARA 4 | 1 |
| MANARA 8 | 1 |
| Date | Type | Unit | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 18 Sep 2026 | Existing | 2 bedrooms | 1,255 sqft | AED 910,000 | 725 |
| 7 Apr 2026 | Existing | 3 bedrooms | 1,411 sqft | AED 1,050,000 | 744 |
| 5 Mar 2026 | Existing | 3 bedrooms | 1,409 sqft | AED 1,000,000 | 710 |
| 27 Feb 2026 | Existing | Studio | 518 sqft | AED 440,000 | 850 |
| 12 Feb 2026 | Existing | 1 bedroom | 708 sqft | AED 600,000 | 847 |
| 3 Feb 2026 | Existing | 1 bedroom | 703 sqft | AED 615,000 | 875 |
| 22 Jan 2026 | Existing | Studio | 507 sqft | AED 400,000 | 788 |
| 15 Dec 2025 | Existing | 2 bedrooms | 1,255 sqft | AED 785,000 | 626 |
| 27 Nov 2025 | Existing | 3 bedrooms | 1,411 sqft | AED 1,200,000 | 850 |
| 27 Nov 2025 | Existing | 2 bedrooms | 1,016 sqft | AED 810,000 | 797 |
| 17 Nov 2025 | Existing | 2 bedrooms | 1,016 sqft | AED 700,000 | 689 |
| 3 Nov 2025 | Existing | 1 bedroom | 713 sqft | AED 570,000 | 799 |
Basis: Dubai Land Department transaction register, arm’s-length sales of units and villas only. Gifts, mortgage registrations, zero-price rows, land plots and whole-building transfers are excluded, as are AED/sqft values outside 100–20,000. Figures are medians, not averages. The medians, trend and quarterly table above are drawn on the part of the register we hold in full detail, which runs from 28 Apr 2025 to 5 Oct 2026; 28 Apr 2025 is the earliest date there, not the date this project started selling. The sale count and date span in the opening sentence cover all registered history to 2 Oct 2026, from the transaction feed below. This page is a dated extract taken on 6 Oct 2026, not a live query. Past registered prices are evidence of what has been paid, not a forecast of future value.
ALL REGISTERED SALES
| Date | Property type | Bedrooms | Area (sq ft) | Price (AED) | AED per sq ft |
|---|---|---|---|---|---|
| 1 Oct 2026 | Flat | 1 B/R | 709 | 580,000 | 819 |
| 18 Sep 2026 | Flat | 2 B/R | 1,255 | 910,000 | 725 |
| 8 Jul 2026 | Flat | 1 B/R | 1,030 | 615,000 | 597 |
| 26 Jun 2026 | Flat | 3 B/R | 1,409 | 1,050,000 | 745 |
| 25 Jun 2026 | — | — | 1,015 | 1,500,000 | 1,478 |
| 7 Apr 2026 | Flat | 3 B/R | 1,412 | 1,050,000 | 744 |
| 13 Mar 2026 | Flat | 2 B/R | 1,016 | 760,000 | 748 |
| 5 Mar 2026 | Flat | 3 B/R | 1,409 | 1,000,000 | 710 |
| 27 Feb 2026 | Flat | Studio | 518 | 440,000 | 850 |
| 12 Feb 2026 | Flat | 1 B/R | 709 | 600,000 | 847 |
| 6 Feb 2026 | — | — | 1,022 | 1,550,000 | 1,517 |
| 3 Feb 2026 | Flat | 1 B/R | 703 | 615,000 | 875 |
| 22 Jan 2026 | Flat | Studio | 507 | 400,000 | 788 |
| 15 Dec 2025 | Flat | 2 B/R | 1,255 | 785,000 | 626 |
| 4 Dec 2025 | Flat | 2 B/R | 1,016 | 750,000 | 738 |
| 27 Nov 2025 | Flat | 2 B/R | 1,016 | 810,000 | 797 |
| 27 Nov 2025 | Flat | 3 B/R | 1,412 | 1,200,000 | 850 |
| 24 Nov 2025 | Flat | 1 B/R | 1,486 | 845,000 | 569 |
| 20 Nov 2025 | — | — | 1,045 | 1,175,000 | 1,125 |
| 17 Nov 2025 | Flat | 2 B/R | 1,016 | 700,000 | 689 |
| 3 Nov 2025 | Flat | 1 B/R | 713 | 570,000 | 799 |
| 27 Oct 2025 | Flat | 3 B/R | 1,409 | 1,125,000 | 799 |
| 29 Sep 2025 | — | — | 1,032 | 1,735,000 | 1,681 |
| 10 Sep 2025 | Flat | 2 B/R | 1,015 | 750,000 | 739 |
| 9 Sep 2025 | Flat | Studio | 512 | 405,000 | 791 |
Source: Dubai Land Department sales register, every registered sale held against this project, as at 2 Oct 2026. The count is every registered sale, of any property type, over the project’s whole history. The median is a separate measure: it covers the 6 months to that date and uses only apartment and villa sales in that period that carry a price and an area. Offices, shops, land and other non-residential sales are listed above but never enter it. Areas are DLD’s square metres converted to square feet.
Location
REGISTERED SALES NEARBY
These are the values DLD records against this project’s own registered sales, not a distance we measured. Where a project’s sales disagree, the most frequently recorded value is shown.
Next step
ASK US ABOUT BADRA PHASE 1
This page is the public register — the project record as at 4 Oct 2026, and the transaction register to 5 Oct 2026.
AVAILABILITY
On the register450 homes
From the DLD project record as at 4 Oct 2026, filed at status “Completed” as at 4 Oct 2026.
Not on the registerWhat is available now
PRICE
On the register475 registered sales
Prices already paid, registered between 19 Jan 2010 and 1 Oct 2026.
Not on the registerAt what price
PAYMENT TERMS
On the register—
The DLD project register carries no payment-plan data of any kind.
Not on the registerOn what payment terms
THE SPECIFIC UNIT
On the register12 recent registrations
Listed above with date, size, price and AED per square foot.
Not on the registerHow the specific unit compares with the ones already registered
Tell us your budget and objective and we will come back with the current position.