Overview
Nuvana by Wadan is a residential building by Wadan at Dubai Islands. Wadan's brochure places it "at the edge of Dubai Islands", and its floor plans show six residential floors and a rooftop. The fact sheet markets one-, two- and three-bedroom units, all fully furnished, equipped and fitted.
Wadan's fact sheet, file dated August 2025, gives a starting price of AED 1.6M. Its payment plan asks 20% on booking, 30% across five dated instalments and 50% on completion. The Dubai Land Department register carries Nuvana as project 3885 with a completion date of 1 September 2027, and Wadan's fact sheet gives Q3 2027.
The Dubai Land Department project register names First Abu Dhabi Bank as the escrow agent holding buyer payments, under escrow account 1091226909082003.
Specification
Wadan's fact sheet and brochure describe a technology package fitted in every residence. The living room has an ultra-slim OLED television, a streaming box, a soundbar and voice control. The kitchen has smart-connected appliances: oven, hob, coffee machine, fridge and microwave, with different layouts for the one-bedroom and the two- and three-bedroom configurations.
Home automation covers lighting, curtains and air conditioning, with USB-C and USB-A smart sockets, phone integration and energy monitoring. The brochure lists a smart lock system, Wi-Fi 7 and smart display panels. It also presents the Nuvana app as "your personal AI concierge", with sections for AI assistance, updates, requests, documents and announcements.
On wellness, the brochure lists natural light optimisation in every unit, yoga terraces with sea breeze, spa-like bathrooms with aromatherapy integration, silent HVAC systems and calming natural finishes throughout.
Amenities
Wadan's brochure lists a lounge, swimming pool, kids' play area, BBQ area, yoga, gym, jacuzzi, sun bathing, sauna, ice bath therapy, Pilates reformers, cinema, billiards and a work station.
Wadan's floor plans place a swimming pool of 651.43 sq ft (60.52 sq m as printed), a gym, sauna, lounge, BBQ area, outdoor kids' play area and pool deck on the first floor. The roof plan shows a swimming pool of 2,182.81 sq ft (202.79 sq m as printed), a jacuzzi, pool deck, covered roof deck, cinema, cabanas and an outdoor shower.
Nearby
| Landmark |
Journey time |
| Infinity Bridge |
5 minutes |
| Nearest metro station |
8 minutes |
| Dubai International Airport |
12 minutes |
| Cruise terminal |
15 minutes |
| Dubai Frame |
20 minutes |
| Downtown Dubai |
24 minutes |
| Dubai Mall |
24 minutes |
Journey times as printed in Wadan's brochure and fact sheet, which give the same figures.
Our Dubai Islands investment guide covers the wider island. Every project we publish there is listed on the Dubai Islands projects page.
Among the attractions already open on the islands is Souk Al Marfa, a large quayside night market of shops, cafés and restaurants, which Nakheel lists among the islands' shopping attractions and which was completed while the archipelago still went by its earlier name, Deira Islands. Two beachfront resort hotels, each with its own water park, were among the first buildings to open there, both developed by Nakheel with international hotel groups. Nakheel also holds Blue Flag certification for a beach on the islands, an award given for clean water and sustainably managed shorelines.
Wadan's brochure places Nuvana at the edge of Dubai Islands, so for residents the wider neighbourhood is this combination of an evening market, resort hotels and certified beach, rather than a long-established residential quarter.
Completion
The Dubai Land Department register lists Nuvana, project 3885, as under construction with a completion date of 1 September 2027. Its most recent inspection, on 30 July 2026, recorded the project 24.87% complete. Wadan's fact sheet gives completion in Q3 2027, and its payment plan dates the completion payment 15 September 2027.