Location: Dubai Islands, Island A – Set along the tranquil shores of Dubai Islands, Ellington Sands I enjoys a prime beachfront location with uninterrupted sea views. Positioned on Island A, this project offers seamless access to soft sandy beaches, landscaped gardens, and key city connections, while maintaining the serenity of a resort-style setting.
Project Overview
Beachfront Living with a Boutique Commercial Element
Ellington Sands I is the first phase of Ellington’s debut in Dubai Islands. The project combines refined residential design with curated resort-style amenities and a limited number of premium retail offerings. Designed for a coastal lifestyle, Sands I introduces elegant architecture, immersive outdoor experiences, and a walkable beachfront layout that connects residents and visitors to retail, recreation, and nature.
Key Stats:
Structure: Tower A (9 residential floors), Tower B (7 residential floors)
Configuration:
Tower A: B + G + 9 Residential Floors + R
- 7 Passenger Elevators
- 1 Service Elevator
Tower B: B + G + 7 Residential Floors + R
- 3 Passenger Elevators
- 1 Service Elevator
Retail Units: 4 (2 in Tower A, 2 in Tower B)
Parking: 1 space for 1 & 2BR units; 2 spaces for 3 & 4BR units
Retail Overview
- Total Units: 4 (2 located in Tower A, 2 in Tower B)
- Sizes: From 1,628.36 sq. ft. to 5,766.01 sq. ft.
- Starting Price: From AED 5,185 PSF *******CONTACT US FOR SPECIAL NEGOTIATED PRICE
- Completion Date: Q4 2029
- Payment Plan: 60/40
Payment Schedule – Ellington Sands I
| No. | Installment Milestone | Timing | Percentage |
| 1 | Down Payment | At time of booking | 20% |
| 2 | First Installment | 90 days after reservation | 5% |
| 3 | Second Installment | 180 days after reservation | 5% |
| 4 | Third Installment | 360 days after reservation | 5% |
| 5 | Fourth Installment | On 20% construction completion | 5% |
| 6 | Fifth Installment | On 30% construction completion | 5% |
| 7 | Sixth Installment | On 40% construction completion | 5% |
| 8 | Seventh Installment | On 50% construction completion | 5% |
| 9 | Eighth Installment | On 60% construction completion | 5% |
| 10 | Final Payment | On completion | 40% |
| Total | 100% |


